• Sn40 Ring Stiffness Mpp Electric Pipe
  • Sn40 Ring Stiffness Mpp Electric Pipe
  • Sn40 Ring Stiffness Mpp Electric Pipe
  • Sn40 Ring Stiffness Mpp Electric Pipe
  • Sn40 Ring Stiffness Mpp Electric Pipe
  • Sn40 Ring Stiffness Mpp Electric Pipe

Sn40 Ring Stiffness Mpp Electric Pipe

After-sales Service: Online After-Sales Service
Warranty: 1 Year
Material: PP
Water Absorption: <0.01%
Contraction Percentage: <0.4%
Ring Stiffness: Sn24, Sn32, Sn40
Samples:
US$ 150/Meter 1 Meter(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory & Trading Company
Diamond Member Since 2024

Suppliers with verified business licenses

Jiangsu, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Self-branded
The supplier has 1 Self-brands, check the Audit Report for more information
In-stock Capacity
The supplier has In-stock capacity
Fast Delivery
The supplier can deliver the goods within 30 days
to see all verified strength labels (22)
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Certifications
  • Packaging & Shipping
  • Installation Instructions
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
DN100mm-250mm
Density
0.90-0.94
Flattening Test
When The Deformation in The Vertical Direction of
Bending Strength
≥36 MPa
Colour
to Be Agreed Upon by Supply and Demand
Link Mode
It Is Connected by Hot Melt Butt
Transport Package
Customized According to Customer Requirements
Specification
According to the customer can be customized
Trademark
Wilvida
Origin
Jiangsu, China
HS Code
3917210000
Production Capacity
100, 000t/Year

Product Description

Product Description
 

The Sn40 Ring Stiffness MPP Electric Pipe utilizes advanced modified polypropylene as its primary material. This innovative solution allows for seamless installation without the need for dredging, digging, or disrupting roadways. Ideal for laying pipelines and cables in challenging environments such as roads, railways, buildings, and riverbeds, our MPP power pipe excels in areas where traditional methods fall short.

Unlike conventional 'digging' construction methods, our trenchless pipe engineering aligns perfectly with modern environmental protection standards. Traditional methods often result in dust removal, traffic congestion, and other disruptive issues. Our technology eliminates these concerns, providing a viable solution for areas where excavation isn't feasible, such as heritage conservation districts, bustling urban centers, protected farmland, highways, and rivers.

Our MPP Electric Pipe boasts an array of advantages: exceptional strength, superior high-temperature resistance, straightforward installation, hassle-free construction, and cost-effectiveness. It's engineered to meet the highest standards of quality and performance, ensuring durability and reliability in every application.

Detailed Photos
 
Sn40 Ring Stiffness Mpp Electric Pipe
Sn40 Ring Stiffness Mpp Electric Pipe
Sn40 Ring Stiffness Mpp Electric Pipe
 
Product Parameters
 
 MPP Cable Conduit Pipe's Parameter Datas
Norminal
Diameter/IN(mm)
Norminal Wall Thickness (mm) Norminal Lenght (mm)
Ring Stiffness (3%) Grade (Normal Temperature)
SN24 SN32 SN40
100 8 8 10 6000/9000
125 8 10 12
150 10 12 14
175 12 14 16
200 14 16 18
225 16 18 20
250 18 20 20
 
Certifications
 
Sn40 Ring Stiffness Mpp Electric Pipe
Sn40 Ring Stiffness Mpp Electric Pipe
Sn40 Ring Stiffness Mpp Electric Pipe
 
Sn40 Ring Stiffness Mpp Electric Pipe
Sn40 Ring Stiffness Mpp Electric Pipe
Sn40 Ring Stiffness Mpp Electric Pipe
 
Packaging & Shipping
 
Sn40 Ring Stiffness Mpp Electric Pipe
Sn40 Ring Stiffness Mpp Electric Pipe
 
Installation Instructions
 

During the installation of the MPP power cable protection tube, the connection method is critical. Choosing the correct method ensures the reliable performance of the power piping system. This section details various common MPP power cable protection tube connection methods, helping you understand their unique features and best application scenarios.

Sn40 Ring Stiffness Mpp Electric Pipe
01, Prior to installation, ensure the welding machine's power supply, hydraulic oil, and heating plate meet the required standards. Perform a dry run on the milling cutter oil pump switch. Fix the slips that match the pipe specifications into the rack. Adjust the heating plate to the required welding temperature. Clean the heating plate's surface with clean soft paper or alcohol to remove any oil stains before heating.

02, Clean both ends of the pipe. Place the pipe into the frame clamp ensuring equal lengths extend from both ends. Support the portions outside the pipe rack with supports. Align the pipe height with the frame's centerline, then secure the slip. Insert and mill the pipe using a milling cutter.

03, Continue milling the pipe until continuous cutting occurs at both ends. Then, release the pressure and let the milling cutter run idle for 2-3 rotations before retracting the movable frame and turning off the milling cutter switch.
 
04, Remove the milling cutter and bring the pipe ends together. Verify that the end faces are aligned; displacement should not exceed 10% of the pipe wall thickness. Ensure no significant gap exists between the pipe ends, adhering to a gap width of 0.3MM (DN.<25MM); If 0.5MM (225MM400MM) does not meet the requirements, it should be milled again.

05, Once the heating plate reaches the set temperature, swiftly place it into the rack, applying the specified pressure until the pipe ends circumferentially flip and the minimum curling reaches the designated height. Lower the pressure to the specified value, ensuring the pipe end faces contact the heating plate, and continue heating for the specified duration.

06, Once the heat absorption time reaches the set value, withdraw the movable frame and promptly remove the heating plate. Close the pipe ends as quickly as possible, without exceeding the specified switching time. Ensure the closing pressure is not too high to prevent the molten material from squeezing out, which can compromise welding quality.

07, Increase the pressure to the specified value and maintain it during cooling. Once naturally cooled to room temperature, release the pressure, loosen the slip, and remove the pipe, completing the welding process.
Sn40 Ring Stiffness Mpp Electric Pipe
 
Company Profile
 
Yangzhou Huawei Pipe Technology Co., Ltd. was founded in the historic city of Yangzhou, China, in 2018. We are committed to providing comprehensive, intelligent pipeline system solutions, delivering excellence and innovation in every project we undertake.
Our extensive product range encompasses HDPE, PVC, PP-R, MPP, and more, catering to a broad spectrum of applications including construction engineering, municipal projects, agricultural drainage and irrigation, gas transportation, home renovation, power cable sheathing, and beyond. Boasting nearly 3,000 varieties and specifications of pipes, fittings, and valves, our offerings meet the diverse needs of our global clientele.
Sn40 Ring Stiffness Mpp Electric Pipe

Our Advantages
We are relentlessly dedicated to international trade, offering tailored services to pipeline dealers worldwide. Our investment in cutting-edge mechanical equipment has enabled us to establish a state-of-the-art manufacturing facility. With an impressive annual output of 30,000 tons, we are capable of filling up to 3,000 containers, ensuring prompt and efficient delivery.
Our superior machinery and impeccable management system enable us to minimize costs, reduce delivery times, and guarantee the highest quality for every product that leaves our facility.
FAQ
 

Are you a trading company or a factory?

We are a professional manufacturer, and we warmly welcome you to visit our factory at your convenience.

What is your delivery time? For small quantity products, delivery is via international courier services (DHL, FedEx, TNT, etc.) or by air, typically taking 3-5 days to reach you post dispatch. For large quantities, we ship by sea, with transit times ranging from a few days to several weeks, depending on the destination port.

Can you provide samples?

Yes, samples are available. For standard products, samples are free of charge, with only the freight fee borne by you. For high-value products, you will need to cover both the freight and a portion of the product cost. Once we have established a good relationship or if you become our VIP customer, complimentary samples will be provided upon request.

Do you offer OEM services?

Absolutely, we provide OEM services tailored to your specifications, including LOGO, packaging, and more.

What are your payment terms?

Our payment terms are T/T or L/C at sight. For T/T, a 30% advance payment is required, with the balance due before shipment, or by L/C.

What is your Minimum Order Quantity (MOQ)?

Our MOQ is based on customer requirements.

Is it possible to use my appointed label or package?

Yes, if needed, we can use labels or packaging as per your specific requirements.

How can you guarantee the quality of your products?

We firmly believe honesty and responsibility are the foundation of any company. Therefore, all products we supply are guaranteed to be of high quality. We conduct thorough testing and provide a Certificate of Analysis (COA) before delivery.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
10
Year of Establishment
2018-05-18