Basic Info.
After-sales Service
Online After-Sales Service
Contraction Percentage
<0.4%
Ring Stiffness
Sn24, Sn32, Sn40
Flattening Test
When The Deformation in The Vertical Direction of
Colour
to Be Agreed Upon by Supply and Demand
Link Mode
It Is Connected by Hot Melt Butt
Transport Package
Customized According to Customer Requirements
Specification
According to the customer can be customized
Product Description
The MPP power pipe, crafted from advanced modified polypropylene, revolutionizes modern construction. Forget the hassles of dredging, digging, and road destruction. This innovative solution is designed for seamless integration in specialized areas such as roads, railways, buildings, and riverbeds, ensuring efficient and undisturbed installation of pipelines, cables, and more.
In stark contrast to the disruptive traditional digging method, trenchless pipe engineering aligns perfectly with environmental preservation goals. Traditional methods bring dust, traffic jams, and countless disturbances. Conversely, this cutting-edge technology thrives in areas where excavation is impractical, offering a boon for heritage conservation districts, bustling downtowns, protected farmlands, major highways, and rivers.
Our MPP power pipe boasts unmatched advantages: exceptional strength, outstanding high-temperature resistance, effortless installation, convenient construction, and cost efficiency. It's the superior choice for modern infrastructure needs.
MPP Cable Conduit Pipe's Parameter Datas |
Norminal Diameter/IN(mm) | Norminal Wall Thickness (mm) | Norminal Lenght (mm) |
Ring Stiffness (3%) Grade (Normal Temperature) |
SN24 | SN32 | SN40 |
100 | 8 | 8 | 10 | 6000/9000 |
125 | 8 | 10 | 12 |
150 | 10 | 12 | 14 |
175 | 12 | 14 | 16 |
200 | 14 | 16 | 18 |
225 | 16 | 18 | 20 |
250 | 18 | 20 | 20 |
Installation Instructions
During the installation process of the MPP power cable protection tube, the connection method holds paramount importance. The correct selection of an appropriate connection method ensures the reliable operation of the power piping system. This section introduces several common MPP power cable protection tube connection methods, helping you understand their characteristics and application scenarios.
01. Before installation, verify whether the power supply, hydraulic oil, and heating plate of the welding machine meet the welding requirements. Conduct an idle test run on the milling cutter oil pump switch. Install the slips that match the pipe specifications into the rack. Set the heating plate temperature to the welding temperature. Prior to heating, clean the heating plate's surface with clean soft paper or alcohol to remove any oil stains.
02. Remove any dirt from both ends of the pipe. Position the pipe into the frame clamp, ensuring the extension length at both ends is equal. Support the parts outside the pipe rack. Align the pipe height with the frame's centerline, then secure the slip. Insert a milling cutter and begin milling the pipe.
03. After milling the pipe until continuous cutting appears at both ends, release the pressure and allow the milling cutter to idle for two or three rotations before retracting the movable frame and turning off the milling cutter switch.
04. Remove the milling cutter and bring the pipes at both ends together. Inspect the end face; the displacement at both ends should not exceed 10% of the pipe wall thickness. When closing, there should be no noticeable gap between the pipe ends, and the gap width should comply with: 0.3MM (DN).<25MM); If 0.5MM (225MM400MM) does not meet the requirements, it should be milled again.
05. Once the heating plate reaches the set temperature, quickly place it into the rack and apply the specified pressure until the pipe ends begin to curl, reaching the specified height. Reduce the pressure so that the pipe ends are in contact with the heating plate, and continue heating for the specified duration.
06.When the heat absorption time is achieved, retract the movable frame and swiftly remove the heating plate. Close the two pipe ends promptly, ensuring the switching time is minimal and does not exceed the specified duration. The closing pressure should be moderate to avoid squeezing out the molten material, which would compromise welding quality.
07.Increase the pressure to the specified level and maintain it during cooling. After natural cooling to room temperature, release the pressure, loosen the slip, remove the pipe, and complete the welding process.
Founded in 2018 in Yangzhou, China, Yangzhou Huawei Pipe Technology Co., Ltd. has rapidly emerged as a leader in providing comprehensive, intelligent pipeline system solutions.
Our extensive product line includes high-quality HDPE, PVC, PP-R, MPP and other series, which are extensively utilized across a range of industries such as construction engineering, municipal engineering, agricultural drainage and irrigation, gas transportation, home decoration, and power cable sheathing. Our catalog boasts nearly 3000 different varieties and specifications of pipes, fittings, and valve products, catering to a diverse array of applications.
Our Advantages
We are passionately committed to international trade, providing pipeline dealers from across the globe with bespoke services tailored to their specific needs. To support our mission, we have invested heavily in state-of-the-art mechanical equipment, resulting in an impressive annual production capacity of 30,000 tons, equivalent to filling 3000 containers.
Our advanced machinery and refined management systems significantly reduce costs, minimize delivery times, and consistently ensure the superior quality of every product we manufacture.
Are you a trading company or a factory?
We are a professional manufacturer, and we warmly invite you to visit our factory at your convenience.
How long is your delivery time? For small quantity orders, delivery is by international courier (DHL, FedEx, TNT, etc.) or by air, typically taking 3-5 days from dispatch. For larger quantities, delivery is by sea, with transit times varying from days to weeks, depending on the destination port.
Can you provide samples?
Yes, samples are available. For standard products, samples are free; you only need to cover the freight. For high-value items, you will need to pay both the freight and a portion of the product cost. Once we have established a long-term relationship or if you become a VIP customer, we will offer free samples as needed.
Do you supply OEM service?
Yes, we offer comprehensive OEM services tailored to your requests, including LOGO customization and packaging.
What are your terms of payment?
We accept TT or L/C at sight. Generally, we require T/T 30% in advance, with the balance payable before shipment or via L/C.
What is your Minimum Order Quantity (MOQ)?
We can accommodate your specific MOQ requirements.
Is it possible to use my specified label or packaging?
Yes, we can use labels or packaging according to your specifications.
How can you guarantee the quality of the products you offer?
We firmly believe that honesty and responsibility form the foundation of our company. Therefore, all our products are guaranteed to be of high quality. We conduct thorough testing and provide a Certificate of Analysis (COA) before delivery.
Address:
Yangzhou, Jiangsu, China
Business Type:
Manufacturer/Factory
Business Range:
Construction & Decoration, Industrial Equipment & Components, Tools & Hardware
Company Introduction:
Yangzhou Huawei Pipe Technology Co., Ltd., founded in the historic city of Yangzhou in 2018, is committed to delivering comprehensive, intelligent pipeline system solutions.
Our diverse product portfolio includes HDPE, PVC, PP-R, MPP, and numerous other series, extensively utilized in construction engineering, municipal projects, agricultural drainage and irrigation, gas transportation, home decoration, power cable sheathing, and more. We proudly offer nearly 3000 different varieties and specifications of pipes, fittings, and valve products.
Our company offers variety of products which can meet your multifarious demands. We adhere to the management principles of "quality first, customer first and credit-based" since the establishment of the company and always do our best to satisfy potential needs of our customers. Our company is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with anirresistible force.