1200mm PE100 HDPE Pipe for Mining Water Supply in Blue

Product Details
Customization: Available
After-sales Service: Online After-Sales Service
Warranty: The Service Life of Polyethylene Pipes Is Over 50
Still deciding? Get samples of $ !
Request Sample
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
In-stock Capacity
The supplier has In-stock capacity
Fast Delivery
The supplier can deliver the goods within 30 days
to see all verified strength labels (22)
  • 1200mm PE100 HDPE Pipe for Mining Water Supply in Blue
  • 1200mm PE100 HDPE Pipe for Mining Water Supply in Blue
  • 1200mm PE100 HDPE Pipe for Mining Water Supply in Blue
  • 1200mm PE100 HDPE Pipe for Mining Water Supply in Blue
  • 1200mm PE100 HDPE Pipe for Mining Water Supply in Blue
  • 1200mm PE100 HDPE Pipe for Mining Water Supply in Blue
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Certifications
  • Packaging & Shipping
  • Installation Instructions
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
DN20-DN1200
Material
HDPE
Kind
Thermoplastics Pipes
Connection
Welding
Color
Black, Blue, White or Customized
Pressure
Pn4 Pn5 Pn6 Pn8 Pn10 Pn12.5 Pn16 Pn20 Pn25
Water Supply Application HDPE Pipe′s PAR
CE, SGS, ISO, CNAS, IAF
Material Grade
100% New Material PE100
Transport Package
Standard Export Packing
Specification
DN20-1600 mm
Trademark
Wilvida
Origin
Jiangsu, China
HS Code
91721000
Production Capacity
500, 000t/Year

Product Description

Product Description

The PE water supply pipes from Yangzhou Huawei Pipe Technology Co., Ltd. are meticulously crafted using premium PE (polyethylene) resin, derived from the polymerization of ethylene monomers. This advanced process, influenced by precise conditions of pressure and temperature, yields resins of various densities, including high-density polyethylene, medium-density polyethylene, and low-density polyethylene. These exceptional pipes boast a suite of unparalleled benefits: remarkable toughness, superior corrosion and crack resistance, stable interfacing, and a featherlight, manageable construction. These attributes make them an indispensable choice in the water supply pipe industry. Remarkably, these pipes not only enable traditional excavation methods but also support cutting-edge, non-excavation construction techniques. The longevity of these polyethylene pipes exceeds 50 years, a testament to their durability validated by stringent international standards, pioneering foreign benchmarks, and extensive practical application.

Detailed Photos


1200mm PE100 HDPE Pipe for Mining Water Supply in Blue
1200mm PE100 HDPE Pipe for Mining Water Supply in Blue
1200mm PE100 HDPE Pipe for Mining Water Supply in Blue

Product Parameters

Water Supply Application HDPE Pipe's Parameter Datas
Normianl Diameter SDR9 SDR11 SDR13.6 SDR17 SDR21 SDR26 SDR33 SDR41
PN20 PN16 PN12.5 PN10 PN8 PN6 PN5 PN4
DN(mm) 2.0Mpa 1.6Mpa 1.25Mpa 1.0Mpa 0.8Mpa 0.6Mpa 0.5Mpa 0.4Mpa
Wall Thickness (mm)
20 2.3  2.0  / / / / / /
25 3.0  2.3  2.0  / / / / /
32 3.6  3.0  2.4  / / / / /
40 4.5  3.7  3.0  / / / / /
50 5.6  4.6  3.7  3.0  2.4  2.3  / /
63 7.1  5.8  4.7  3.8  3.0  2.5  / /
75 8.4  6.8  5.6  4.5  3.6  2.9  / /
90 10.1  8.2  6.7  5.4  4.3  3.5  / /
110 12.3  10.0  8.1  6.6  5.3  4.2  / /
125 14.0  11.4  9.2  7.4  6.0  4.8  / /
140 15.7  12.7  10.3  8.3  6.7  5.4  / /
160 17.9  14.6  11.8  9.5  7.7  6.2  / /
180 20.1  16.4  13.3  10.7  8.6  6.9  / /
200 22.4  18.2  14.7  11.9  9.6  7.7  / /
225 25.2  20.5  16.6  13.4  10.8  8.6  / /
250 27.9  22.7  18.4  14.8  11.9  9.6  / /
280 31.3  25.4  20.6  16.6  13.4  10.7  / /
315 35.2  28.6  23.2  18.7  15.0  12.1  9.7  7.7 
355 39.7  32.2  26.1  21.1  16.9  13.6  10.9  8.7 
400 44.7  36.3  29.4  23.7  19.1  15.3  12.3  9.8 
450 50.3  40.9  33.1  26.7  21.5  17.2  13.8  11.0 
500 55.8  45.4  36.8  29.7  23.9  19.1  15.3  12.3 
560 62.5  50.8  41.2  33.2  26.7  21.4  17.2  13.7 
630 70.3  57.2  46.3  37.4  30.0  24.1  19.3  15.4 
710 79.3  64.5  52.5  42.1  33.9  27.2  21.8  17.4 
800 89.3  72.6  58.8  47.4  38.1  30.6  24.5  19.6 
900 / 81.7  66.2  53.3  42.9  34.4  27.6  22.0 
1000 / 90.7  72.6  59.3  47.7  38.2  30.6  24.5 
1200 / 109.1  88.2  67.9  57.2  45.9  36.7  29.4 
1400 / / 102.9  82.4  66.7  53.5  42.9  34.3 
1600 / / 117.6  94.1  76.2  61.2  49.0  39.2 
Note: The HDPE pipe wall thickness is base on the GB/T 13663.2-2018 standard,there will be little different if produce accroding to EN/ISO/AS/NZS standard.

Certifications


1200mm PE100 HDPE Pipe for Mining Water Supply in Blue
1200mm PE100 HDPE Pipe for Mining Water Supply in Blue
1200mm PE100 HDPE Pipe for Mining Water Supply in Blue

Packaging & Shipping


1200mm PE100 HDPE Pipe for Mining Water Supply in Blue
1200mm PE100 HDPE Pipe for Mining Water Supply in Blue

Installation Instructions


1200mm PE100 HDPE Pipe for Mining Water Supply in Blue
1. For the seamless installation of buried polyethylene water supply pipelines, it is essential to employ only electric fusion welding and hot melt docking methods. Under no circumstances should screw connections or bonding be used. Each type of polyethylene water supply pipeline connection must be executed using specialized tools to ensure precision. It is critical to avoid using open flames for heating during the connection process to maintain safety and integrity.

2. Ensure that polyethylene pipes are connected using PE pipes and fittings that are of the same brand, material, and SDR rating. Before beginning the connection process, perform a comprehensive test to verify that the quality aligns with the required standards, ensuring durability and reliability.

3. The joining of polyethylene water supply pipelines demands that pipe ends are immaculate. At the conclusion of each work session, temporarily seal the pipe openings to preserve cleanliness. Immediately after completing the connection, inspect the interface rigorously to ensure a secure fit.

4. Prior to and following the hot melt butt welding process, meticulously clean the heating plate with a spotless cotton cloth. It is vital to follow the heating time and temperature guidelines provided by the manufacturers of both the hot melt butt welding machine and the pipes and fittings to guarantee a flawless connection.

5. Adhere to the specified pressure holding and cooling durations for hot melt butt welding as outlined by both the equipment and pipe manufacturers. During these critical periods, it is imperative to refrain from moving or applying any pressure to the connecting parts to maintain the integrity of the weld.

6. After the connection, it is of utmost importance to conduct a water pressure test on the pipes. This test should be performed within 1 hour of completing the hot-melt weld. Ensure the pipeline is securely fastened and joints are exposed prior to the hydrostatic test. The pipeline should be filled with water, with all air expelled, to check for water tightness and confirm the reliability of the connection.

7. Pipeline engineering construction is deemed operational only after the successful completion and approval of the final acceptance inspection, marking the culmination of a meticulous installation process and the beginning of reliable service.
1200mm PE100 HDPE Pipe for Mining Water Supply in Blue

Company Profile


Founded amidst the historical charm and cultural richness of Yangzhou, China, in 2018, Yangzhou Huawei Pipe Technology Co., Ltd. has rapidly emerged as a distinguished vanguard in intelligent pipeline system solutions. Our steadfast mission is to provide comprehensive, cutting-edge solutions meticulously crafted to address the diverse and ever-evolving needs of our esteemed global clientele.
Our expansive and adaptable product line includes HDPE, PVC, PP-R, MPP, and more, each precisely engineered to meet a myriad of applications. These applications span from construction engineering and municipal projects to agricultural drainage and irrigation, gas transportation, home renovation, and power cable sheathing. With an extraordinary catalogue featuring nearly 3,000 distinct varieties and specifications, our comprehensive offerings encompass the complete range of pipes, fittings, and valve products, ensuring a tailored solution for every piping necessity.
1200mm PE100 HDPE Pipe for Mining Water Supply in Blue

Our Advantages
In our pursuit of global trade excellence, we extend personalized services to pipeline dealers worldwide. This commitment is supported by substantial investments in state-of-the-art mechanical equipment, laying the groundwork for a modern, high-capacity factory. Our formidable production capabilities boast an annual output of 30,000 tons, filling up to 3,000 containers, enabling us to meet and exceed the burgeoning demands of our international clientele.
By leveraging our advanced machinery and executing a stellar management system, we adeptly minimize costs, accelerate delivery times, and uphold the highest standards of quality in every product we manufacture.

FAQ


Are you a trading company or a factory?

We are a distinguished manufacturer, and we warmly welcome you to visit our state-of-the-art factory at your convenience.

What is your delivery time?

For small quantities, we utilize international couriers (DHL, FedEx, TNT, etc.) or air freight, ensuring you receive the goods within 3-5 days post-dispatch. For larger orders, we ship by sea, and the delivery time varies from days to weeks, depending on your destination port.


Can you provide samples?

Absolutely, samples are available. For standard products, samples are complimentary; you only need to cover the shipping costs. For high-value items, both the product cost and shipping are required. However, once we establish a solid partnership or if you become a VIP customer, complimentary samples will be provided.

Do you offer OEM services?

Yes, we provide customized OEM services tailored to your specifications, including LOGO and packaging.

What are your terms of payment?

We accept T/T or L/C at sight. For T/T, a 30% advance payment is required, with the balance due before shipment or via L/C.

What is your Minimum Order Quantity (MOQ)?

Our MOQ is flexible and can be adjusted according to the customer's requests.

Can we use our own label or packaging?

Absolutely. We are happy to accommodate your label or packaging requirements.

How can you ensure the quality of your products?

Integrity and responsibility are the cornerstones of our company. All products we supply are thoroughly tested and qualified. We provide a Certificate of Analysis (COA) before delivery to ensure quality.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier