Basic Info.
After-sales Service
Online After-Sales Service
Contraction Percentage
<0.4%
Ring Stiffness
Sn24, Sn32, Sn40
Flattening Test
When The Deformation in The Vertical Direction of
Colour
to Be Agreed Upon by Supply and Demand
Link Mode
It Is Connected by Hot Melt Butt
Transport Package
Customized According to Customer Requirements
Specification
According to the customer can be customized
Product Description
Our MPP Power Pipe is a cutting-edge solution crafted from modified polypropylene, designed to revolutionize the way you approach construction projects. Without the need for dredging, digging, or road surface destruction, this pipe system allows for seamless integration of pipelines, cables, and other utilities across challenging sections such as roads, railways, buildings, and riverbeds.
Trenchless pipe engineering, a hallmark of our MPP Power Pipe, surpasses traditional digging methods by meeting stringent environmental protection standards. While conventional methods generate disruptive dust, cause traffic congestion, and face limitations in certain areas, our advanced technology ensures smooth operations in places like heritage conservation districts, bustling downtown areas, protected farmland, highways, and rivers, where excavation is impractical or prohibited.
Our MPP Power Pipe offers an array of outstanding benefits including exceptional strength, superior high-temperature resistance, straightforward installation, and convenient construction. Additionally, it is a cost-effective solution that meets the diverse needs of modern infrastructure projects.
MPP Cable Conduit Pipe's Parameter Datas |
Norminal Diameter/IN(mm) | Norminal Wall Thickness (mm) | Norminal Lenght (mm) |
Ring Stiffness (3%) Grade (Normal Temperature) |
SN24 | SN32 | SN40 |
100 | 8 | 8 | 10 | 6000/9000 |
125 | 8 | 10 | 12 |
150 | 10 | 12 | 14 |
175 | 12 | 14 | 16 |
200 | 14 | 16 | 18 |
225 | 16 | 18 | 20 |
250 | 18 | 20 | 20 |
Installation Instructions
During the installation of MPP power cable protection tubes, choosing the correct connection method is crucial for ensuring the reliable operation of the power piping system. This guide introduces several common MPP power cable protection tube connection methods, detailing their characteristics and application scenarios to help you make an informed choice.
01. Before beginning installation, ensure that the power supply, hydraulic oil, and heating plate of the welding machine meet the necessary welding requirements. Conduct a test run on the milling cutter oil pump switch, etc. Install the slips that correspond to the pipe specifications into the rack. Set the heating plate to the required welding temperature and clean its surface with soft paper or alcohol to remove any oil stains before heating.
02. Clean both ends of the pipe thoroughly. Place the pipe into the frame clamp, ensuring equal extension at both ends. Support the parts outside the pipe rack with appropriate supports. Align the pipe with the centerline of the frame and secure the slip. Insert the milling cutter to begin milling the pipe.
03. Mill the pipe until continuous cutting occurs at both ends. Then, release the pressure and let the milling cutter idle for two to three rotations before retracting the movable frame and turning off the milling cutter switch.
04. Remove the milling cutter and close the ends of the pipes together. Check the end faces; the displacement at both ends should not exceed 10% of the pipe wall thickness. When closing, ensure there is no significant gap between the pipe ends, and that the gap width adheres to the specified standard: 0.3MM (DN).<25MM); If 0.5MM (225MM400MM) does not meet the requirements, it should be milled again.
05. When the heating plate reaches the set temperature, quickly place it into the rack and apply the specified pressure until the pipe ends' circumference flips and the curling reaches the desired height. Reduce the pressure to the specified value to bring the pipe ends into contact with the heating plate and maintain heating for the specified duration.
06.Once the heat absorption time reaches the specified value, retract the movable frame and swiftly remove the heating plate. Close the pipe ends together as quickly as possible, ensuring the switching time does not exceed the specified limit. Apply closing pressure carefully to avoid squeezing out molten material and compromising welding quality.
07.Increase the pressure to the specified value and maintain it during the cooling phase. Allow the welded joint to cool naturally to room temperature. Once cooled, release the pressure, loosen the slip, remove the pipe, and complete the welding process.
Founded in the historic city of Yangzhou, China, in 2018, Yangzhou Huawei Pipe Technology Co., Ltd. is committed to delivering comprehensive, intelligent pipeline system solutions.
Our esteemed product range includes HDPE, PVC, PP-R, MPP, and various other series, extensively utilized across construction engineering, municipal engineering, agricultural drainage and irrigation, gas transportation, home decoration, power cable sheathing, and more. With nearly 3000 distinctive varieties and specifications of pipes, fittings, and valve products, we cater to diverse needs effectively.
Our Advantages
We are passionately engaged in international trade, offering customized services to pipeline dealers worldwide. Our state-of-the-art factory houses professional mechanical equipment, enabling us to achieve an impressive annual output of 30,000 tons, equating to 3000 filled containers.
Our superior machinery and exemplary management system help in minimizing costs, shortening delivery times, and ensuring impeccable quality across all our products.
Are you a trading company or a manufacturing factory?
We are a professional manufacturer. We warmly invite you to visit our factory at your convenience to see our operations firsthand.
How long is your delivery time? For small quantity orders, products will be delivered via international couriers (DHL, FedEx, TNT, etc.) or by air, typically arriving within 3-5 days after dispatch. For larger quantity orders, products will be shipped by sea, with delivery times varying from days to weeks depending on the destination port.
Can you provide samples?
Yes, we provide samples. For standard products, samples are free; you only need to cover the shipping costs. For high-value products, both the sample cost and shipping fees apply. After establishing a long-term partnership or if you become one of our VIP customers, free samples will be provided upon request.
Do you offer OEM services?
Yes, we offer OEM services tailored to your needs, including customized logos, packaging, and more.
What are your terms of payment?
Our payment terms are TT or L/C at sight. Specifically, T/T 30% in advance, with the balance due before shipment or by L/C.
What is your Minimum Order Quantity (MOQ)?
We cater to our customers' specific requirements regarding MOQ.
Is it possible to use my appointed label or packaging?
Yes, we are happy to accommodate your labeling or packaging requirements.
How can you guarantee the quality of the products you offer?
We uphold honesty and responsibility as our core principles. All products provided to you are guaranteed to be qualified. We conduct thorough testing and provide a Certificate of Analysis (COA) before delivery to ensure quality.
Address:
Yangzhou, Jiangsu, China
Business Type:
Manufacturer/Factory
Business Range:
Construction & Decoration, Industrial Equipment & Components, Tools & Hardware
Company Introduction:
Yangzhou Huawei Pipe Technology Co., Ltd., founded in the historic city of Yangzhou in 2018, is committed to delivering comprehensive, intelligent pipeline system solutions.
Our diverse product portfolio includes HDPE, PVC, PP-R, MPP, and numerous other series, extensively utilized in construction engineering, municipal projects, agricultural drainage and irrigation, gas transportation, home decoration, power cable sheathing, and more. We proudly offer nearly 3000 different varieties and specifications of pipes, fittings, and valve products.
Our company offers variety of products which can meet your multifarious demands. We adhere to the management principles of "quality first, customer first and credit-based" since the establishment of the company and always do our best to satisfy potential needs of our customers. Our company is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with anirresistible force.