• Advanced Mpp Conduit Plastic Tube
  • Advanced Mpp Conduit Plastic Tube
  • Advanced Mpp Conduit Plastic Tube
  • Advanced Mpp Conduit Plastic Tube
  • Advanced Mpp Conduit Plastic Tube
  • Advanced Mpp Conduit Plastic Tube

Advanced Mpp Conduit Plastic Tube

After-sales Service: Online After-Sales Service
Warranty: 1 Year
Material: PP
Water Absorption: <0.01%
Contraction Percentage: <0.4%
Ring Stiffness: Sn24, Sn32, Sn40
Samples:
US$ 150/Meter 1 Meter(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory & Trading Company
Diamond Member Since 2024

Suppliers with verified business licenses

Jiangsu, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Self-branded
The supplier has 1 Self-brands, check the Audit Report for more information
In-stock Capacity
The supplier has In-stock capacity
Fast Delivery
The supplier can deliver the goods within 30 days
to see all verified strength labels (22)
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Certifications
  • Packaging & Shipping
  • Installation Instructions
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
DN100mm-250mm
Density
0.90-0.94
Flattening Test
When The Deformation in The Vertical Direction of
Bending Strength
≥36 MPa
Colour
to Be Agreed Upon by Supply and Demand
Link Mode
It Is Connected by Hot Melt Butt
Transport Package
Customized According to Customer Requirements
Specification
According to the customer can be customized
Trademark
Wilvida
Origin
Jiangsu, China
HS Code
3917210000
Production Capacity
100, 000t/Year

Product Description

Product Description

The MPP power pipe, crafted from modified polypropylene, offers a groundbreaking solution for modern infrastructure needs. This innovative conduit eliminates the need for dredging, excavation, and road destruction, enabling seamless installation of pipelines, cables, and other utilities in challenging environments like roads, railways, buildings, and riverbeds.

In stark contrast to traditional excavation methods, trenchless pipe engineering is a testament to environmental stewardship. By sidestepping issues like dust pollution, traffic congestion, and other disruptions, this technology proves indispensable in areas where excavation is impractical, such as heritage conservation districts, bustling city centers, protected farmlands, major highways, and river systems.

This cutting-edge solution boasts numerous advantages, including exceptional strength, outstanding high-temperature resistance, ease of installation, and cost-effective construction. Its comprehensive benefits make it an unparalleled choice for modern pipeline projects.

Detailed Photos

Advanced Mpp Conduit Plastic Tube
Advanced Mpp Conduit Plastic Tube
Advanced Mpp Conduit Plastic Tube

Product Parameters

 MPP Cable Conduit Pipe's Parameter Datas
Norminal
Diameter/IN(mm)
Norminal Wall Thickness (mm) Norminal Lenght (mm)
Ring Stiffness (3%) Grade (Normal Temperature)
SN24 SN32 SN40
100 8 8 10 6000/9000
125 8 10 12
150 10 12 14
175 12 14 16
200 14 16 18
225 16 18 20
250 18 20 20

Certifications

Advanced Mpp Conduit Plastic Tube
Advanced Mpp Conduit Plastic Tube
Advanced Mpp Conduit Plastic Tube

Advanced Mpp Conduit Plastic Tube
Advanced Mpp Conduit Plastic Tube
Advanced Mpp Conduit Plastic Tube

Packaging & Shipping

Advanced Mpp Conduit Plastic Tube
Advanced Mpp Conduit Plastic Tube

Installation Instructions

During the installation of the MPP power cable protection tube, selecting the correct connection method is crucial for ensuring the reliable operation of the power piping system. This section details several common connection methods for MPP power cable protection tubes, aiming to help you understand the unique characteristics and ideal application scenarios for each method.

Advanced Mpp Conduit Plastic Tube
01. Prior to installation, verify that the power supply, hydraulic oil, and heating plate of the welding machine meet the necessary welding requirements. Conduct a test run on the milling cutter oil pump switch, among others. Insert the appropriately sized slips into the rack. Adjust the heating plate to achieve the desired welding temperature, and clean its surface with soft paper or alcohol to remove any oil stains before heating.

02. Clean both ends of the pipe to remove any dirt. Position the pipe in the frame clamp, ensuring equal extension lengths on both ends. Use supports to hold the pipe outside the pipe rack at the same height as the frame's centerline. Secure the slip, insert the milling cutter, and proceed to mill the pipe.

03. Once continuous cutting is achieved at both pipe ends, release the pressure and allow the milling cutter to idle for two to three rotations. Retract the movable frame and switch off the milling cutter.

04. Remove the milling cutter and align the pipes at both ends. Ensure the end-face displacement does not exceed 10% of the pipe wall thickness. When closing the pipe ends, there should be no visible gap, or it should adhere to the standard of: 0.3MM (DN.<25MM); If 0.5MM (225MM400MM) does not meet the requirements, it should be milled again.

05. Upon reaching the set temperature of the heating plate, quickly position it in the rack and apply the specified pressure until the circumference at the pipe ends flares and the minimum curling height is achieved. Reduce the pressure accordingly to allow the pipe end faces to contact the heating plate, continuing to heat for the required time.

06.When the heat absorption time is met, retract the movable frame swiftly and remove the heating plate. Join the two pipe ends, ensuring the switching time is minimized and within the specified limits. Avoid excessive closing pressure to prevent the extrusion of molten material and maintain welding quality.

07.Increase the pressure to the specified level and maintain it during the cooling process. Allow natural cooling to room temperature, then release the pressure, loosen the slip, and remove the pipe, completing the welding process.
Advanced Mpp Conduit Plastic Tube

Company Profile

Yangzhou Huawei Pipe Technology Co., Ltd. was founded in the picturesque city of Yangzhou, China, in 2018. Since its inception, the company has passionately dedicated itself to offering innovative and comprehensive intelligent pipeline system solutions.
Our distinguished company specializes in an extensive range of products including HDPE, PVC, PP-R, MPP, and others. These products are essential across various industries such as construction engineering, municipal projects, agricultural drainage and irrigation, gas transportation, home decoration, and power cable sheathing. We proudly offer nearly 3000 distinct varieties and specifications of pipes, fittings, and valve products, catering to a myriad of applications.
Advanced Mpp Conduit Plastic Tube

Our Advantages
We are unwaveringly committed to international trade, providing bespoke services to pipeline dealers globally. To achieve excellence, we have invested in an array of cutting-edge mechanical equipment to establish a state-of-the-art factory. Our impressive annual production capacity reaches 30,000 tons, efficiently filling up to 3,000 containers.
Our advanced machinery and impeccable management system enable us to minimize costs, reduce delivery times, and ensure the unmatched quality of every product we produce.
FAQ

Are you a trading company or a factory?

We are a professional manufacturer. You are warmly welcome to visit our factory at your convenience.

What is your delivery time? For small-quantity orders, products will be delivered via international courier (DHL, FedEx, TNT, etc.) or by air, usually within 3-5 days. For larger orders, shipping by sea is available, taking anywhere from several days to weeks depending on the destination port.

Can you provide samples?

Yes, samples are available. For standard products, samples are free; you only need to cover the freight. For high-value items, you must bear both the freight and a portion of the product cost. For our VIPs or after multiple collaborations, free samples will be provided whenever needed.

Do you offer OEM services?

Yes, we provide OEM services tailored to your needs, including LOGO, packaging, and more.

What are your payment terms?

TT or L/C at sight. For T/T, 30% in advance, and the balance before shipment; for L/C, as agreed.

What is your Minimum Order Quantity (MOQ)?

As per customers' requests.

Can I use my own label or packaging?

Absolutely. We can use your specified label or packaging as per your requirements.

How do you ensure product quality?

Integrity and responsibility are the cornerstones of our company. All products provided are of high quality. We conduct thorough tests and provide a Certificate of Analysis (COA) before delivery.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

People who viewed this also viewed

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
10
Year of Establishment
2018-05-18