• Premium Electric Power PVC Conduit
  • Premium Electric Power PVC Conduit
  • Premium Electric Power PVC Conduit
  • Premium Electric Power PVC Conduit
  • Premium Electric Power PVC Conduit
  • Premium Electric Power PVC Conduit

Premium Electric Power PVC Conduit

After-sales Service: Online After-Sales Service
Warranty: 1 Year
Material: PP
Water Absorption: <0.01%
Contraction Percentage: <0.4%
Ring Stiffness: Sn24, Sn32, Sn40
Samples:
US$ 150/Meter 1 Meter(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory & Trading Company
Diamond Member Since 2024

Suppliers with verified business licenses

Jiangsu, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Self-branded
The supplier has 1 Self-brands, check the Audit Report for more information
In-stock Capacity
The supplier has In-stock capacity
Fast Delivery
The supplier can deliver the goods within 30 days
to see all verified strength labels (22)
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Certifications
  • Packaging & Shipping
  • Installation Instructions
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
DN100mm-250mm
Density
0.90-0.94
Flattening Test
When The Deformation in The Vertical Direction of
Bending Strength
≥36 MPa
Colour
to Be Agreed Upon by Supply and Demand
Link Mode
It Is Connected by Hot Melt Butt
Transport Package
Customized According to Customer Requirements
Specification
According to the customer can be customized
Trademark
Wilvida
Origin
Jiangsu, China
HS Code
3917210000
Production Capacity
100, 000t/Year

Product Description

Product Description

The MPP power pipe, crafted from modified polypropylene, revolutionizes construction by eliminating the need for dredging, digging, or damaging the road surface. This innovative solution facilitates the seamless laying of pipelines, cables, and other infrastructure in challenging sections such as roads, railways, buildings, and riverbeds.

Embracing trenchless technology, this advanced piping method surpasses the outdated 'digging method' by aligning with modern environmental protection standards. Traditional construction often results in dust, traffic congestion, and other nuisances, but this cutting-edge technology allows for the undisturbed installation of pipelines, even in sensitive areas like Heritage Conservation Districts, bustling downtowns, protected farmlands, highways, and rivers.

Boasting a suite of exceptional advantages, our product offers unparalleled high strength, superior high temperature resistance, easy installation, convenient construction, and cost-effectiveness, making it the ideal choice for your engineering needs.

Detailed Photos

Premium Electric Power PVC Conduit
Premium Electric Power PVC Conduit
Premium Electric Power PVC Conduit

Product Parameters

 MPP Cable Conduit Pipe's Parameter Datas
Norminal
Diameter/IN(mm)
Norminal Wall Thickness (mm) Norminal Lenght (mm)
Ring Stiffness (3%) Grade (Normal Temperature)
SN24 SN32 SN40
100 8 8 10 6000/9000
125 8 10 12
150 10 12 14
175 12 14 16
200 14 16 18
225 16 18 20
250 18 20 20

Certifications

Premium Electric Power PVC Conduit
Premium Electric Power PVC Conduit
Premium Electric Power PVC Conduit

Premium Electric Power PVC Conduit
Premium Electric Power PVC Conduit
Premium Electric Power PVC Conduit

Packaging & Shipping

Premium Electric Power PVC Conduit
Premium Electric Power PVC Conduit

Installation Instructions

In the installation process of the MPP power cable protection tube, choosing the correct connection method is crucial for the reliable operation of the power piping system. This section introduces several common MPP power cable protection tube connection methods, providing insight into their characteristics and application scenarios. Ensuring the right connection technique can significantly enhance the efficiency and safety of your installation.

Premium Electric Power PVC Conduit
01, Before beginning installation, ensure the welding machine's power supply, hydraulic oil, and heating plate meet the welding requirements. Conduct a test run on the milling cutter, oil pump switch, and other components. Install the slips that match the pipe specifications into the rack. Set the heating plate to the appropriate welding temperature and clean its surface using clean soft paper or alcohol to remove any oil stains.

02, Remove any dirt from both ends of the pipe. Secure the pipe into the frame clamp, ensuring equal extension lengths at both ends. Support the parts outside the pipe rack with additional supports. Align the pipe to the centerline height of the frame, secure the slip, insert a milling cutter, and proceed to mill the pipe.

03, Mill the pipe until continuous cutting is achieved at both ends. Then, release the pressure and let the milling cutter idle for two to three revolutions before retracting the movable frame and switching off the milling cutter.

04, Remove the milling cutter and bring the pipe ends together. Verify that the end face displacement does not exceed 10% of the pipe wall thickness. When closing, ensure no significant gap between the pipe ends, adhering to a gap width of 0.3MM (DN.<25MM); If 0.5MM (225MM400MM) does not meet the requirements, it should be milled again.

05, When the heating plate reaches the set temperature, swiftly place it into the rack and apply the specified pressure until the pipe ends flip, achieving the minimum required curling height. Reduce the pressure to the specified value, ensuring the pipe end face contacts the heating plate and continues heating for the designated time.

06, Once the heat absorption time is met, retract the movable frame and promptly remove the heating plate. Close the pipe ends together quickly, keeping the switching time minimal and within the specified limit. Ensure the closing pressure is not excessively high to avoid squeezing out molten material, which could compromise welding quality.07, Increase the pressure to the specified value and maintain it during cooling. After natural cooling to room temperature, release the pressure, loosen the slip, and remove the pipe to complete the welding process.

07, Elevate the pressure to the required value and keep it steady during the cooling phase. Once the pipe has naturally cooled to room temperature, release the pressure, loosen the slip, and remove the pipe, thus completing the welding operation.Raise the pressure to the specified value and maintain pressure for cooling. After natural cooling to room temperature, release the pressure, loosen the slip, remove the pipe, and complete the welding.
Premium Electric Power PVC Conduit

Company Profile

Founded in 2018 in Yangzhou, China, Yangzhou Huawei Pipe Technology Co., Ltd. is unwaveringly devoted to offering streamlined, intelligent pipeline system solutions.
Our diverse product range features high-quality HDPE, PVC, PP-R, MPP, and more. These products are essential across a variety of sectors, including construction engineering, municipal projects, agricultural drainage and irrigation, gas transportation, home decoration, and power cable sheathing. With nearly 3000 distinct varieties and specifications, our catalog of pipes, fittings, and valve products is unparalleled.
Premium Electric Power PVC Conduit

Our Advantages
We are committed to international trade, providing pipeline dealers globally with bespoke services. To support this, we have invested heavily in advanced mechanical equipment to construct a state-of-the-art manufacturing facility. Our impressive annual output of 30,000 tons is sufficient to fill 3000 containers.
With top-tier machinery and an excellent management system, we are able to significantly reduce costs, expedite delivery times, and guarantee the superior quality of each product.
FAQ

Are you a trading company or a factory?

Yangzhou Huawei Pipe Technology Co., Ltd. is a professional manufacturer. We warmly welcome you to visit our factory at your convenience.

How long is your delivery time? For small quantity products, they will be delivered to you by international courier (DHL, FedEx, TNT, etc.) or by air. Typically, it will take 3-5 days for you to receive the goods after they are shipped. For large quantity products, delivery is by sea, and it will take from several days to weeks to reach your destination port, depending on its location.

Can you provide samples?

Yes, samples are available. For standard products, samples are free; you only need to cover the shipping costs. For high-value products, you will need to pay for both the freight and a portion of the product cost. Once we have established a long-term partnership or if you become our VIP customer, we will provide free samples as needed.

Do you supply OEM services?

Yes, we offer comprehensive OEM services tailored to your requests, including custom logos, packaging, and more.

What are your terms of payment?

We accept TT or L/C at sight. For T/T, a 30% advance payment is required, with the remaining balance due before shipment, or via L/C.

What is your MOQ?

Minimum Order Quantity (MOQ) is based on customer requests.

Is it possible to use my appointed label or package?

Yes. We can accommodate your requirements for specific labels or packaging.

How can you guarantee the quality of the goods you offer?

We firmly believe that honesty and responsibility are the foundation of our company. Therefore, all the products we provide are of high quality. We will conduct rigorous testing and provide a Certificate of Analysis (COA) before delivery to ensure quality.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

People who viewed this also viewed

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
10
Year of Establishment
2018-05-18