Basic Info.
After-sales Service
Online After-Sales Service
Contraction Percentage
<0.4%
Ring Stiffness
Sn24, Sn32, Sn40
Flattening Test
When The Deformation in The Vertical Direction of
Colour
to Be Agreed Upon by Supply and Demand
Link Mode
It Is Connected by Hot Melt Butt
Transport Package
Customized According to Customer Requirements
Specification
According to the customer can be customized
Product Description
The MPP power pipe, crafted from modified polypropylene, revolutionizes infrastructure projects. Without the need for dredging, excavation, or road destruction, it seamlessly facilitates the installation of pipelines and cables across challenging sections such as roads, railways, buildings, and riverbeds.
In contrast to traditional excavation methods, trenchless pipe engineering aligns perfectly with environmental protection standards. By mitigating dust, alleviating traffic congestion, and reducing other disruptive factors, this advanced technology proves invaluable in areas where excavation is impractical. Ideal for Heritage Conservation Districts, bustling downtown areas, protected crop farmlands, highways, and rivers, it enhances efficiency and minimizes ecological footprint.
This innovative solution boasts numerous advantages: exceptional strength, remarkable high-temperature resistance, straightforward installation, effortless construction, and cost-effectiveness.
MPP Cable Conduit Pipe's Parameter Datas |
Norminal Diameter/IN(mm) | Norminal Wall Thickness (mm) | Norminal Lenght (mm) |
Ring Stiffness (3%) Grade (Normal Temperature) |
SN24 | SN32 | SN40 |
100 | 8 | 8 | 10 | 6000/9000 |
125 | 8 | 10 | 12 |
150 | 10 | 12 | 14 |
175 | 12 | 14 | 16 |
200 | 14 | 16 | 18 |
225 | 16 | 18 | 20 |
250 | 18 | 20 | 20 |
Installation Instructions
In the installation process of MPP power cable protection tube, the connection method is a very important part. The correct selection of the appropriate connection method can ensure the reliable operation of the power piping system. This section introduces several common MPP power cable protection tube connection methods to help you understand the characteristics and application scenarios of each method.
01, Before installing, ensure the power supply, hydraulic oil, and heating plate of the welding machine meet the required standards. Perform an empty run test on the milling cutter oil pump switch. Fit the slips that match the pipe specifications into the rack. Set the heating plate's temperature to the welding temperature, and clean its surface with soft paper or alcohol to remove any oil stains before heating.
02, Remove any dirt from both pipe ends. Position the pipe in the frame clamp, ensuring equal length extension at both ends, supported by external supports. Align the pipe height with the frame's centerline and secure the slip. Insert the milling cutter and begin milling the pipe.
03, Once continuous cutting is achieved at both ends, release the pressure and idle the milling cutter for two or three weeks before retracting the movable frame and turning off the milling cutter.
04, Remove the milling cutter and bring the pipe ends together. Ensure the end-face displacement does not exceed 10% of the pipe wall thickness. There should be no noticeable gap between the pipe ends, adhering to the gap width specification of 0.3MM (DN).<25MM); If 0.5MM (225MM400MM) does not meet the requirements, it should be milled again.
05, When the heating plate reaches the set temperature, quickly position it in the rack and apply the specified pressure until the pipe end circumference curls to the required height. Reduce the pressure to the specified value, ensuring contact between the pipe end face and heating plate, and continue heating for the specified time.
06,When the heat absorption time reaches the specified value, retract the movable frame and swiftly remove the heating plate. Bring the two pipe ends together quickly, ensuring the switching time does not exceed the specified value. Avoid excessive closing pressure to prevent squeezing out molten material and compromising weld quality.
07,Increase the pressure to the specified level and maintain it for cooling. After natural cooling to room temperature, release the pressure, loosen the slip, and remove the pipe to complete the welding process.
Yangzhou Huawei Pipe Technology Co., Ltd. was founded in the historic and vibrant city of Yangzhou, China, in 2018. Since its inception, our company has been dedicated to offering comprehensive, intelligent pipeline system solutions that meet the diverse needs of our customers.
Our extensive product range includes HDPE, PVC, PP-R, MPP, and other series, impeccably designed for applications in construction engineering, municipal engineering, agricultural drainage and irrigation, gas transportation, home decoration, and power cable sheathing. With nearly 3000 distinct varieties and specifications in pipes, fittings, and valve products, we cater to a broad spectrum of industrial needs.
Our Advantages
Committed to excellence in international trade, we supply pipeline dealers worldwide with tailored services that meet their specific requirements. To support this, we have invested in a state-of-the-art factory equipped with advanced machinery, enabling us to achieve an impressive annual output of 30,000 tons, equating to 3000 fully-loaded containers.
Our top-tier machinery and sophisticated management system significantly reduce costs, shorten delivery times, and guarantee the unwavering quality of each product, ensuring customer satisfaction with every order.
Are you a trading company or a factory?
We are a professional manufacturer and warmly welcome you to visit our factory at your convenience.
How long is your delivery time? For small quantity products, we utilize international couriers (DHL, FedEx, TNT, etc.) or air shipping, ensuring you receive the goods within 3-5 days after dispatch. For large quantity orders, we opt for sea freight, which can take anywhere from several days to a few weeks, depending on the destination port.
Can you provide samples?
Yes, samples are available. For standard products, samples are offered free of charge; you only need to cover the shipping costs. For high-value items, both the freight and a portion of the product cost will apply. Once we establish a long-term partnership or if you become a VIP customer, free samples will be provided whenever needed.
Do you supply OEM service?
Yes, we offer OEM services tailored to your requests, including customization of the logo, packaging, and more.
What are your terms of payment?
We accept TT or L/C at sight. Typically, a 30% deposit is required in advance, with the remaining balance due before shipment or as per the L/C terms.
What is your MOQ?
Our Minimum Order Quantity (MOQ) is tailored to meet customers' specific requirements.
Is it possible to use my appointed label or package?
Absolutely. We are more than willing to use labels or packaging according to your specific requirements.
How can you guarantee the quality of the goods you offer?
We uphold honesty and responsibility as the core of our company values. Thus, all products supplied are guaranteed to be of high quality. Prior to delivery, goods undergo rigorous testing, and a Certificate of Analysis (COA) is provided for your assurance.
Address:
Yangzhou, Jiangsu, China
Business Type:
Manufacturer/Factory
Business Range:
Construction & Decoration, Industrial Equipment & Components, Tools & Hardware
Company Introduction:
Yangzhou Huawei Pipe Technology Co., Ltd., founded in the historic city of Yangzhou in 2018, is committed to delivering comprehensive, intelligent pipeline system solutions.
Our diverse product portfolio includes HDPE, PVC, PP-R, MPP, and numerous other series, extensively utilized in construction engineering, municipal projects, agricultural drainage and irrigation, gas transportation, home decoration, power cable sheathing, and more. We proudly offer nearly 3000 different varieties and specifications of pipes, fittings, and valve products.
Our company offers variety of products which can meet your multifarious demands. We adhere to the management principles of "quality first, customer first and credit-based" since the establishment of the company and always do our best to satisfy potential needs of our customers. Our company is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with anirresistible force.