Basic Info.
After-sales Service
Online After-Sales Service
Contraction Percentage
<0.4%
Ring Stiffness
Sn24, Sn32, Sn40
Flattening Test
When The Deformation in The Vertical Direction of
Colour
to Be Agreed Upon by Supply and Demand
Link Mode
It Is Connected by Hot Melt Butt
Transport Package
Customized According to Customer Requirements
Specification
According to the customer can be customized
Product Description
Our MPP power pipe, crafted from superior modified polypropylene, revolutionizes traditional construction methods. This advanced product eliminates the need for dredging, road excavation, and surface destruction, making it ideal for projects in complex areas such as roads, railways, buildings, and riverbeds.
Embrace the future with trenchless pipe engineering, an eco-friendly innovation compared to conventional methods. Traditional constructions often lead to dust, traffic disruptions, and other inconveniences. Our trenchless technology thrives in challenging environments where excavation is impossible, such as heritage sites, bustling city centers, protected farmlands, highways, and river crossings.
Boasting impressive features, our MPP power pipe offers exceptional high strength, superior temperature resistance, and effortless installation. Experience seamless construction with cost-effective solutions that do not compromise on quality or performance.
MPP Cable Conduit Pipe's Parameter Datas |
Norminal Diameter/IN(mm) | Norminal Wall Thickness (mm) | Norminal Lenght (mm) |
Ring Stiffness (3%) Grade (Normal Temperature) |
SN24 | SN32 | SN40 |
100 | 8 | 8 | 10 | 6000/9000 |
125 | 8 | 10 | 12 |
150 | 10 | 12 | 14 |
175 | 12 | 14 | 16 |
200 | 14 | 16 | 18 |
225 | 16 | 18 | 20 |
250 | 18 | 20 | 20 |
Installation Instructions
During the installation process of the MPP power cable protection tube, choosing the right connection method is crucial. Proper selection ensures reliable operation of the power piping system. This section presents various commonly used MPP power cable protection tube connection methods, detailing their characteristics and application scenarios for better understanding.
01,Before beginning installation, ensure that the power supply, hydraulic oil, and heating plate of the welding machine meet the required specifications. Conduct a test run on the milling cutter oil pump switch. Install the slips matching the pipe's specifications into the rack. Set the heating plate to the welding temperature. Before heating, clean the heating plate's surface with soft, clean paper or alcohol to remove any oil stains.
02,Remove any dirt from both ends of the pipe. Place the pipe into the frame clamp, ensuring that the extension length is equal at both ends. Support the parts extending outside the pipe rack. Align the pipe to match the frame's centerline height and then secure the slip. Insert the milling cutter and start milling the pipe.
03,Mill the pipe until continuous cutting is achieved at both ends. Release the pressure and let the milling cutter idle for two to three rotations before retracting the movable frame and turning off the milling cutter switch.
04,Remove the milling cutter and close the pipes at both ends. Inspect the end faces; the displacement at both ends should not exceed 10% of the pipe wall thickness. Ensure there is no significant gap between the pipe ends when closing, adhering to the gap width standard: 0.3MM (DN).<25MM); If 0.5MM (225MM400MM) does not meet the requirements, it should be milled again.
05,Once the heating plate reaches the set temperature, quickly place it into the rack and apply the specified pressure until the pipe ends curl to the specified height. Reduce the pressure to the designated value to ensure the pipe end faces contact the heating plate. Continue heating for the specified duration.
06,When the heat absorption time reaches its required value, retract the movable frame and swiftly remove the heating plate. Close the two pipe ends together, ensuring the switching time is minimal and does not exceed the specified limit. The closing pressure should be moderate to avoid squeezing out molten material, which can compromise welding quality.
07,Increase the pressure to the specified value and maintain it during the cooling process. After allowing the pipe to cool naturally to room temperature, release the pressure. Loosen the slip and remove the pipe, thus completing the welding process.
Yangzhou Huawei Pipe Technology Co., Ltd. was founded in the picturesque city of Yangzhou, China, in 2018. Our mission is to deliver comprehensive, intelligent pipeline system solutions with unmatched quality and efficiency.
We proudly offer a diverse portfolio of products, including HDPE, PVC, PP-R, MPP, and other series. Our versatile products serve a multitude of applications such as construction, municipal engineering, agricultural drainage, irrigation, gas transportation, home decoration, power cable sheathing, and more. With nearly 3000 different varieties and specifications of pipes, fittings, and valve products, we cater to an extensive array of needs.
Our Advantages
Dedicated to excellence in international trade, we supply pipeline dealers worldwide with bespoke services. Our investment in state-of-the-art mechanical equipment has transformed our factory into a modern marvel, boasting an impressive annual output of 30,000 tons, equivalent to filling 3000 containers.
Our advanced machinery, coupled with a sophisticated management system, enables us to minimize costs, reduce delivery times, and uphold the highest standards of product quality.
Are you a trading company or a factory?
We are a professional manufacturer, and we warmly invite you to visit our state-of-the-art factory at your convenience.
How long is your delivery time? For small quantity products, they will be delivered to you by international courier (DHL, FedEx, TNT, etc.) or by air. Typically, it takes 3-5 days for you to receive the goods after dispatch. For larger quantity products, they are shipped by sea, which can take from several days to weeks to reach your destination port, depending on its location.
Can you provide samples?
Yes, samples are available. For standard products, samples are free; you only need to cover the freight. For high-value products, you will need to pay both the freight and a portion of the product cost. Once we've established a long-term partnership or when you become a VIP customer, free samples will be provided upon request.
Do you supply OEM services?
Yes, we offer OEM services tailored to your requirements, including logo design, packaging, and more.
What are your terms of payment?
We accept TT or L/C at sight. Typically, T/T 30% in advance, with the balance paid before shipment or by L/C.
What is your MOQ (Minimum Order Quantity)?
Our MOQ is flexible and based on customer requests.
Is it possible to use my appointed label or packaging?
Absolutely. If required, we can use your specified label or packaging according to your needs.
How can you guarantee the quality of the goods you offer?
We believe that honesty and responsibility are the foundation of our company. Therefore, we guarantee that all products we provide are of high quality. We conduct thorough testing and provide a Certificate of Analysis (COA) before delivery to ensure this.
Address:
Yangzhou, Jiangsu, China
Business Type:
Manufacturer/Factory
Business Range:
Construction & Decoration, Industrial Equipment & Components, Tools & Hardware
Company Introduction:
Yangzhou Huawei Pipe Technology Co., Ltd., founded in the historic city of Yangzhou in 2018, is committed to delivering comprehensive, intelligent pipeline system solutions.
Our diverse product portfolio includes HDPE, PVC, PP-R, MPP, and numerous other series, extensively utilized in construction engineering, municipal projects, agricultural drainage and irrigation, gas transportation, home decoration, power cable sheathing, and more. We proudly offer nearly 3000 different varieties and specifications of pipes, fittings, and valve products.
Our company offers variety of products which can meet your multifarious demands. We adhere to the management principles of "quality first, customer first and credit-based" since the establishment of the company and always do our best to satisfy potential needs of our customers. Our company is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with anirresistible force.