Basic Info.
After-sales Service
Online After-Sales Service
Contraction Percentage
<0.4%
Ring Stiffness
Sn24, Sn32, Sn40
Flattening Test
When The Deformation in The Vertical Direction of
Colour
to Be Agreed Upon by Supply and Demand
Link Mode
It Is Connected by Hot Melt Butt
Transport Package
Customized According to Customer Requirements
Specification
According to the customer can be customized
Product Description
The MPP Power Pipe, crafted from advanced modified polypropylene, revolutionizes modern construction. This innovative product eliminates the need for traditional dredging, digging, and road surface disruptions. It is ideal for laying pipelines and cables in specialized sections such as roads, railways, buildings, and river beds.
Unlike the traditional digging method, our trenchless pipe engineering aligns perfectly with stringent environmental protection standards. It significantly reduces dust, minimizes traffic congestion, and eliminates other disruptive factors caused by conventional construction. This technology is especially beneficial in areas where excavation is not feasible, including heritage conservation districts, bustling downtown areas, protected farmland, highways, and rivers.
Our product boasts numerous advantages: exceptional high strength, excellent high temperature resistance, ease of installation, convenient construction processes, and cost-effectiveness.
MPP Cable Conduit Pipe's Parameter Datas |
Norminal Diameter/IN(mm) | Norminal Wall Thickness (mm) | Norminal Lenght (mm) |
Ring Stiffness (3%) Grade (Normal Temperature) |
SN24 | SN32 | SN40 |
100 | 8 | 8 | 10 | 6000/9000 |
125 | 8 | 10 | 12 |
150 | 10 | 12 | 14 |
175 | 12 | 14 | 16 |
200 | 14 | 16 | 18 |
225 | 16 | 18 | 20 |
250 | 18 | 20 | 20 |
Installation Instructions
In the installation process of MPP power cable protection tube, the connection method is a very important part. The correct selection of the appropriate connection method can ensure the reliable operation of the power piping system. This section introduces several common MPP power cable protection tube connection methods to help you understand the characteristics and application scenarios of each method.
01,Before installation, check whether the power supply, hydraulic oil, and heating plate of the welding machine meet the welding requirements; Conduct an empty car test run on the milling cutter oil pump switch, etc; Install the slips that match the specifications of the pipe into the rack; Set the temperature of the heating plate to the welding temperature, and before heating, wipe the surface of the heating plate with clean soft paper or alcohol to clean its oil stains.
02,Remove dirt from both ends of the pipe. Place the pipe into the frame clamp so that the length of the extension at both ends is equal. The parts outside the pipe rack should be supported by supports. Place the pipe at the same height as the centerline of the frame, and then secure the slip. Insert a milling cutter and mill the pipe.
03,After milling the pipe until continuous cutting occurs at both ends of the pipe, remove the pressure and let the milling cutter idle for two or three weeks before retracting the movable frame and turning off the milling cutter switch.
04,Take out the milling cutter and close the pipes at both ends. Check the end face, and the displacement of both ends of the pipe should not exceed 10% of the pipe wall thickness. When closing, there should be no obvious gap between the two end faces of the pipe, and the gap width should comply with: 0.3MM (DN<25MM); If 0.5MM (225MM400MM) does not meet the requirements, it should be milled again.
05,When the temperature of the heating plate reaches the set value, quickly place it into the rack and apply the specified pressure until the circumference of the pipe ends is flipped and the minimum curling reaches the specified height. Reduce the pressure to the specified value, so that the end face of the pipe is in contact with the heating plate, and continue heating until the specified time.
06,When the heat absorption time reaches the specified value, retract the movable frame and quickly remove the heating plate. Close the two pipe ends, and the switching time should be as short as possible, not exceeding the specified value. The closing pressure should not be too high, otherwise it will squeeze out the molten material and cause a decrease in welding quality.
07,Raise the pressure to the specified value and maintain pressure for cooling. After natural cooling to room temperature, release the pressure, loosen the slip, remove the pipe, and complete the welding.
Founded in the vibrant city of Yangzhou, China in 2018, Yangzhou Huawei Pipe Technology Co., Ltd. has been unwaveringly committed to delivering comprehensive, intelligent pipeline system solutions.
Our diverse product range includes HDPE, PVC, PP-R, MPP, and other series, catering to a multitude of applications such as construction engineering, municipal works, agricultural drainage and irrigation, gas transportation, residential decoration, and power cable sheathing. With nearly 3000 varieties and specifications, our offerings encompass pipes, fittings, and valve products to meet every need.
Our Advantages
Dedicated to global trade, we provide bespoke services to pipeline dealers worldwide. Our investment in advanced machinery ensures the operation of a state-of-the-art modern factory, boasting an impressive annual output of 30,000 tons-equivalent to filling 3000 containers.
With top-tier machinery and an impeccable management system, we reduce costs, expedite delivery times, and guarantee the superior quality of every product we produce.
Are you a trading company or a manufacturer?
We are a renowned manufacturer, and we extend a warm invitation for you to visit our factory at your convenience.
What is your delivery time frame? For small quantity orders, we use international couriers (DHL, FedEx, TNT, etc.) or air freight, enabling delivery in approximately 3-5 days. For larger orders, we ship by sea, and transit times vary from days to weeks depending on the destination port.
Do you offer sample products?
Absolutely! We provide samples. For standard products, samples are free; you only need to cover the shipping costs. For high-value products, there will be a cost for both the samples and shipping. Long-term partners and VIP customers receive free samples upon request.
Do you offer OEM services?
Yes, we provide OEM services tailored to your needs, including custom logos and packaging.
What are your payment terms?
We accept TT or L/C at sight. Typically, we require T/T 30% in advance, with the balance due before shipment or through L/C.
What is your Minimum Order Quantity (MOQ)?
Our MOQ is flexible and can be adjusted according to customer requirements.
Can I use my own label or packaging?
Certainly. We can accommodate your specific label or packaging requirements.
How do you ensure product quality?
We uphold honesty and responsibility as our core values. All our products are thoroughly tested and certified. We conduct tests and provide a Certificate of Analysis (COA) before delivery to guarantee quality.
Address:
Yangzhou, Jiangsu, China
Business Type:
Manufacturer/Factory
Business Range:
Construction & Decoration, Industrial Equipment & Components, Tools & Hardware
Company Introduction:
Yangzhou Huawei Pipe Technology Co., Ltd., founded in the historic city of Yangzhou in 2018, is committed to delivering comprehensive, intelligent pipeline system solutions.
Our diverse product portfolio includes HDPE, PVC, PP-R, MPP, and numerous other series, extensively utilized in construction engineering, municipal projects, agricultural drainage and irrigation, gas transportation, home decoration, power cable sheathing, and more. We proudly offer nearly 3000 different varieties and specifications of pipes, fittings, and valve products.
Our company offers variety of products which can meet your multifarious demands. We adhere to the management principles of "quality first, customer first and credit-based" since the establishment of the company and always do our best to satisfy potential needs of our customers. Our company is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with anirresistible force.