• Durable PVC Electric Power Hose Pipe
  • Durable PVC Electric Power Hose Pipe
  • Durable PVC Electric Power Hose Pipe
  • Durable PVC Electric Power Hose Pipe
  • Durable PVC Electric Power Hose Pipe
  • Durable PVC Electric Power Hose Pipe

Durable PVC Electric Power Hose Pipe

After-sales Service: Online After-Sales Service
Warranty: 1 Year
Material: PP
Water Absorption: <0.01%
Contraction Percentage: <0.4%
Ring Stiffness: Sn24, Sn32, Sn40
Samples:
US$ 150/Meter 1 Meter(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory & Trading Company
Diamond Member Since 2024

Suppliers with verified business licenses

Jiangsu, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Self-branded
The supplier has 1 Self-brands, check the Audit Report for more information
In-stock Capacity
The supplier has In-stock capacity
Fast Delivery
The supplier can deliver the goods within 30 days
to see all verified strength labels (22)
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Certifications
  • Packaging & Shipping
  • Installation Instructions
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
DN100mm-250mm
Density
0.90-0.94
Flattening Test
When The Deformation in The Vertical Direction of
Bending Strength
≥36 MPa
Colour
to Be Agreed Upon by Supply and Demand
Link Mode
It Is Connected by Hot Melt Butt
Transport Package
Customized According to Customer Requirements
Specification
According to the customer can be customized
Trademark
Wilvida
Origin
Jiangsu, China
HS Code
3917210000
Production Capacity
100, 000t/Year

Product Description

Product Description

Our MPP power pipe is crafted from high-quality modified polypropylene, offering an innovative solution for construction. This advanced pipe eliminates the need for dredging, digging, or disrupting road surfaces, making it the ideal choice for laying pipelines, cables, and other infrastructure projects in challenging sections, including roads, railways, buildings, and riverbeds.

Trenchless pipe engineering, unlike traditional methods, meets the highest environmental protection standards. Traditional construction methods often lead to dust, traffic congestion, and other inconveniences, but our trenchless technology overcomes these obstacles. It is perfect for scenarios where excavation is not feasible, such as heritage conservation districts, dense urban areas, protected farmlands, highways, and river crossings.

Our MPP power pipe boasts numerous advantages: it offers high strength, excellent high-temperature resistance, easy installation, and convenient construction, all at a low cost. It is a superior choice for a wide range of applications.

Detailed Photos

Durable PVC Electric Power Hose Pipe
Durable PVC Electric Power Hose Pipe
Durable PVC Electric Power Hose Pipe

Product Parameters

 MPP Cable Conduit Pipe's Parameter Datas
Norminal
Diameter/IN(mm)
Norminal Wall Thickness (mm) Norminal Lenght (mm)
Ring Stiffness (3%) Grade (Normal Temperature)
SN24 SN32 SN40
100 8 8 10 6000/9000
125 8 10 12
150 10 12 14
175 12 14 16
200 14 16 18
225 16 18 20
250 18 20 20

Certifications

Durable PVC Electric Power Hose Pipe
Durable PVC Electric Power Hose Pipe
Durable PVC Electric Power Hose Pipe

Durable PVC Electric Power Hose Pipe
Durable PVC Electric Power Hose Pipe
Durable PVC Electric Power Hose Pipe

Packaging & Shipping

Durable PVC Electric Power Hose Pipe
Durable PVC Electric Power Hose Pipe

Installation Instructions

During the installation of the MPP power cable protection tube, selecting the correct connection method is crucial to ensure reliable operation. This section introduces several common MPP power cable protection tube connection methods to help you understand their characteristics and application scenarios.

Durable PVC Electric Power Hose Pipe
01. Before installation, check if the power supply, hydraulic oil, and heating plate of the welding machine meet welding requirements. Conduct an empty test run on the milling cutter oil pump switch and install the slips matching the pipe specifications into the rack. Set the heating plate temperature to the welding temperature, and before heating, wipe its surface with clean soft paper or alcohol to remove oil stains.

02. Remove dirt from both pipe ends. Place the pipe into the frame clamp so the extension length at both ends is equal. The parts outside the pipe rack should be supported. Align the pipe height with the frame's centerline, then secure the slip and insert a milling cutter to mill the pipe.

03. Mill the pipe until continuous cutting occurs at both ends, then remove the pressure and let the milling cutter idle for two to three weeks before retracting the movable frame and turning off the milling cutter switch.

04. Remove the milling cutter and close the pipes at both ends. Check the end face; the displacement at both ends should not exceed 10% of the pipe wall thickness. When closing, there should be no noticeable gap between the two ends, and the gap width should comply with the specified 0.3MM (DN).<25MM); If 0.5MM (225MM400MM) does not meet the requirements, it should be milled again.

05. Once the heating plate reaches the set temperature, quickly place it into the rack and apply the specified pressure until the circumference of the pipe ends is flipped and the minimum curling reaches the specified height. Reduce the pressure to the specified value to ensure the pipe end faces are in contact with the heating plate, and continue heating until the specified time.

06.When the heat absorption time reaches the specified value, retract the movable frame and quickly remove the heating plate. Close the two pipe ends as quickly as possible, ensuring the switching time does not exceed the specified limit. The closing pressure should not be too high to avoid squeezing out molten material and compromising welding quality.

07.Raise the pressure to the specified value and maintain it for cooling. After natural cooling to room temperature, release the pressure, loosen the slip, remove the pipe, and complete the welding process.
Durable PVC Electric Power Hose Pipe

Company Profile

Founded in the historic city of Yangzhou, China in 2018, Yangzhou Huawei Pipe Technology Co., Ltd. is committed to delivering exceptional one-stop intelligent pipeline system solutions.
Our extensive product range includes HDPE, PVC, PP-R, MPP, and numerous other series, perfectly suited for applications in construction engineering, municipal engineering, agricultural drainage and irrigation, gas transportation, home decor, and power cable sheathing among others. With nearly 3000 distinct varieties and specifications of pipes, fittings, and valve products, we cater to diverse needs with precision.
Durable PVC Electric Power Hose Pipe

Our Advantages
Dedicated to international trade, we provide bespoke services to pipeline dealers across the globe. Our investment in cutting-edge mechanical equipment supports the creation of a state-of-the-art factory, boasting an impressive annual output of 30,000 tons – equivalent to filling 3,000 containers.
Leveraging superior machinery and an impeccable management system, we effectively reduce costs, expedite delivery, and ensure the unparalleled quality of every product.
FAQ

Are you a trading company or a factory?

We are a distinguished manufacturer. We warmly invite you to visit our factory at your convenience.

How long is your delivery time? For small quantities, we ship via international couriers like DHL, FedEx, and TNT, or by air. Typically, you will receive your goods within 3-5 days after dispatch. For larger orders, we ship by sea, with arrival times ranging from days to weeks, depending on the destination port.

Can you provide samples?

Yes, samples are available. For standard products, samples are free but you need to cover the shipping costs. For high-value products, both the shipping and a portion of the product cost apply. Long-term partners and VIP customers enjoy free samples upon request.

Do you supply OEM services?

Yes, we provide OEM services tailored to your requirements, including logo design and packaging.

What are your terms of payment?

We accept TT or L/C at sight. For TT, a 30% advance is required with the balance due before shipment. Alternatively, payment can be made via L/C.

What is your Minimum Order Quantity (MOQ)?

Our MOQ is flexible and can be adjusted according to customer requests.

Can I use my own label or packaging?

Absolutely. We can customize labels and packaging according to your requirements.

How can you ensure the quality of the goods?

We uphold honesty and responsibility as our core values. Rest assured, all our products are qualified. We conduct rigorous testing and provide Certificates of Analysis (COA) before delivery.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

People who viewed this also viewed

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
10
Year of Establishment
2018-05-18