消息
×
loading..
x

Compact PVC Conduit for Cables

US$0.33
100-999 Meters
US$0.32
1,000+ Meters
Port:
Shanghai, China
Production Capacity:
100, 000t/Year
Payment Terms:
L/C, T/T, D/P, Western Union, Paypal, Money Gram

Last Login Date:

Jul 29, 2025

Business Type:

Manufacturer/Factory

Main Products:

CPVC Cable Protection Tube, Mpp Cable Protection Tube, HDPE Water Supply Pipe, HDPE Water Supply Pipe Fittings, PVC-U Drain Pipe, PVC-U Drainpipe Fittings, CPVC Fire Hose, PVC Threaded Pipe, UPVC Industrial Pipe, UPVC Industrial Pipe Fitting

Find Similar Products

Product Description

Company Info

Basic Info.

Model NO.
DN100mm-250mm
After-sales Service
Online After-Sales Service
Warranty
1 Year
Material
PP
Water Absorption
<0.01%
Contraction Percentage
<0.4%
Ring Stiffness
Sn24, Sn32, Sn40
Density
0.90-0.94
Flattening Test
When The Deformation in The Vertical Direction of
Bending Strength
≥36 MPa
Colour
to Be Agreed Upon by Supply and Demand
Link Mode
It Is Connected by Hot Melt Butt
Trademark
Wilvida
Transport Package
Customized According to Customer Requirements
Specification
According to the customer can be customized
Origin
Jiangsu, China
HS Code
3917210000

Product Description

Product Description
 

Our MPP power pipe, crafted from high-quality modified polypropylene, revolutionizes construction by eliminating the need for dredging, digging, and destructing road surfaces. Perfect for laying pipelines and cables in critical sections such as roads, railways, buildings, and river beds, this innovative solution ensures a seamless and efficient installation process.

Unlike the traditional 'digging method,' our trenchless pipe engineering meets modern environmental protection standards. It mitigates issues like dust removal and traffic congestion, allowing for unobtrusive pipeline installation in sensitive areas such as Heritage Conservation Districts, busy downtown areas, farmland protection zones, highways, and riverbeds.

Our MPP power pipe boasts a multitude of advantages, including exceptional strength, superior high-temperature resistance, ease of installation, convenient construction, and cost-effective solutions.

Detailed Photos
 

 
Product Parameters
 
 MPP Cable Conduit Pipe's Parameter Datas
Norminal
Diameter/IN(mm)
Norminal Wall Thickness (mm)Norminal Lenght (mm)
Ring Stiffness (3%) Grade (Normal Temperature)
SN24SN32SN40
10088106000/9000
12581012
150101214
175121416
200141618
225161820
250182020
 
Certifications
 

 

 
Packaging & Shipping
 

 
Installation Instructions
 

In the installation process of MPP power cable protection tube, the connection method is a very important part. The correct selection of the appropriate connection method can ensure the reliable operation of the power piping system. This section introduces several common MPP power cable protection tube connection methods to help you understand the characteristics and application scenarios of each method.


01, Before commencing installation, ensure that the power supply, hydraulic oil, and heating plate of the welding machine meet all welding requirements. Conduct an empty car test run on the milling cutter oil pump switch, among other checks. Next, install the slips that match the pipe's specifications into the rack. Set the temperature of the heating plate to the required welding temperature. Prior to heating, cleanse the surface of the heating plate with clean soft paper or alcohol to remove any oil stains.

02, Remove any dirt from both ends of the pipe. Secure the pipe into the frame clamp, ensuring that the extension length at both ends is equal. Use supports to hold the parts outside the pipe rack. Align the pipe to the same height as the centerline of the frame, and then secure the slip. Insert a milling cutter to mill the pipe.

03, Mill the pipe until continuous cutting occurs at both ends. After this, remove the pressure and let the milling cutter idle for two or three revolutions before retracting the movable frame and turning off the milling cutter switch.
 

04, Remove the milling cutter and bring the pipes at both ends together. Inspect the end face; the displacement at both ends should not exceed 10% of the pipe wall thickness. When closing the pipe ends, there should be no observable gap between the two faces, and the gap width should comply with: 0.3MM (DN.<25MM); If 0.5MM (225MM400MM) does not meet the requirements, it should be milled again.

05, When the heating plate reaches the set temperature, swiftly place it into the rack and apply the specified pressure until the circumference of the pipe ends flips and the minimum curling reaches the designated height. Reduce the pressure to the specified value, ensuring the pipe end face contacts the heating plate, and continue heating for the specified duration.

06,When the heat absorption time reaches the specified value, retract the movable frame and quickly remove the heating plate. Close the two pipe ends together within the shortest time possible, not exceeding the specified switching time. Ensure that the closing pressure isn't too high to avoid squeezing out molten material and compromising welding quality.

07,Increase the pressure to the specified value and maintain it for cooling. After allowing the pipes to cool naturally to room temperature, release the pressure, loosen the slip, remove the pipe, and complete the welding process.
 
Company Profile
 
Established in 2018 in the historic city of Yangzhou, China, Yangzhou Huawei Pipe Technology Co., Ltd. is a pioneering force dedicated to providing comprehensive, intelligent pipeline system solutions.
Our extensive product range includes HDPE, PVC, PP-R, MPP, and more, catering to a variety of applications such as construction engineering, municipal works, agricultural drainage, irrigation systems, gas transportation, home decor, and power cable sheathing. We proudly offer nearly 3000 different varieties and specifications of pipes, fittings, and valve products.
Our Advantages
Committed to excelling in international trade, we provide customized services to pipeline dealers worldwide. Our state-of-the-art factory is equipped with advanced machinery, leading to an impressive annual output of 30,000 tons, efficiently filling up 3000 containers.
Our cutting-edge machinery and robust management system ensure cost efficiency, reduced delivery times, and uncompromised product quality.
FAQ
 

Are you a trading company or a factory?

We are a professional manufacturer. We warmly welcome you to visit our factory at your convenience.

How long is your delivery time? For small quantity orders, we deliver via international couriers (DHL, FedEx, TNT, etc.) or by air. Typically, you will receive the goods within 3-5 days after dispatch. For large quantity orders, we deliver by sea. The transit time ranges from days to weeks, depending on the destination port.

Can you provide samples?

Yes, samples are available. For standard products, samples are free-you only need to cover the freight. For high-value products, you need to pay for both the freight and a portion of the product cost. Once we have established a partnership or if you are a VIP customer, we will offer free samples whenever you need them.

Do you offer OEM services?

Yes, we provide OEM services tailored to your requests, including custom logos and packaging.

What are your terms of payment?

We accept TT or L/C at sight. For T/T payments, 30% is required in advance, with the balance due before shipment or via L/C.

What is your MOQ (Minimum Order Quantity)?

Our MOQ is flexible and can be adjusted according to customer requirements.

Is it possible to use my specified label or packaging?

Yes, we are happy to use labels or packaging as per your specifications.

How can you ensure the quality of the goods you provide?

We believe that honesty and responsibility are the foundation of our company. Therefore, all products we offer are of high quality. We conduct thorough testing and provide a Certificate of Analysis (COA) before delivery.

Send your message to this supplier
Mr. Kongwei

Post a Sourcing Request Now

People who liked this also liked