Basic Info.
After-sales Service
Online After-Sales Service
Contraction Percentage
<0.4%
Ring Stiffness
Sn24, Sn32, Sn40
Flattening Test
When The Deformation in The Vertical Direction of
Colour
to Be Agreed Upon by Supply and Demand
Link Mode
It Is Connected by Hot Melt Butt
Transport Package
Customized According to Customer Requirements
Specification
According to the customer can be customized
Product Description
Our state-of-the-art MPP power pipe harnesses the strength of modified polypropylene as its core component. This innovative material allows for seamless installation without the need for disruptive activities such as dredging, digging, or road surface damage. Ideal for various specialized construction projects, our conduit is perfect for applications beneath roads, railways, urban buildings, and river beds.
Embrace the future of eco-friendly construction with our trenchless pipe engineering solution, designed to meet rigorous environmental protection standards. Unlike traditional methods that generate dust, cause traffic congestion, and disrupt daily life, our advanced technology ensures smooth, unobtrusive pipeline installation. Whether in heritage conservation zones, bustling city centers, protected farmland areas, highways, or rivers, our solution excels where conventional excavation cannot.
Experience unparalleled advantages with our Lightweight MPP Conduit: exceptional strength, superior high-temperature resistance, effortless installation, and cost-effective construction. Make the smart choice for durability and efficiency.
MPP Cable Conduit Pipe's Parameter Datas |
Norminal Diameter/IN(mm) | Norminal Wall Thickness (mm) | Norminal Lenght (mm) |
Ring Stiffness (3%) Grade (Normal Temperature) |
SN24 | SN32 | SN40 |
100 | 8 | 8 | 10 | 6000/9000 |
125 | 8 | 10 | 12 |
150 | 10 | 12 | 14 |
175 | 12 | 14 | 16 |
200 | 14 | 16 | 18 |
225 | 16 | 18 | 20 |
250 | 18 | 20 | 20 |
Installation Instructions
In the meticulous installation process of the MPP power cable protection tube, the connection method stands as a pivotal element. Selecting the correct and appropriate connection technique is crucial to ensuring the reliable and seamless operation of the power piping system. This section elucidates various common connection methods for MPP power cable protection tubes, helping you understand the unique characteristics and application scenarios of each method.
01. Before installation, ensure the power supply, hydraulic oil, and heating plate of the welding machine meet the required welding standards. Conduct a dry run test on the milling cutter and oil pump switch. Fit the slips matching the pipe specifications into the rack. Adjust the heating plate to the designated welding temperature, and clean its surface with soft paper or alcohol to remove any oil stains before heating.
02. Clear any dirt from both pipe ends. Position the pipe in the frame clamp so that the extensions at both ends are equal, with the external parts supported appropriately. Align the pipe height with the frame's centerline, then secure the slip. Insert a milling cutter to mill the pipe.
03. Mill the pipe until continuous cutting is observed at both pipe ends. Release the pressure and let the milling cutter idle for two to three cycles before retracting the movable frame and turning off the milling cutter switch.
04. Remove the milling cutter and bring the pipe ends together. Inspect the end face alignment; the displacement at both ends should not exceed 10% of the pipe wall thickness. When closing, ensure there is no significant gap, with the gap width adhering to 0.3MM (DN.<25MM); If 0.5MM (225MM400MM) does not meet the requirements, it should be milled again.
05. Once the heating plate reaches the set temperature, swiftly place it into the rack and apply the specified pressure until the pipe ends curl to the minimum specified height. Reduce the pressure to the designated value to allow the end face of the pipe to contact the heating plate, maintaining heat until the specified time is reached.
06.Upon reaching the specified heat absorption time, retract the movable frame and swiftly remove the heating plate. Close the pipe ends rapidly, ensuring the switching time is minimal and does not exceed the specified limit. Avoid excessive closing pressure to prevent squeezing out molten material and compromising welding quality.
07.Raise the pressure to the specified value and maintain it for cooling. Allow the pipe to cool naturally to room temperature before releasing the pressure, loosening the slip, and removing the pipe, thus completing the welding process.
Yangzhou Huawei Pipe Technology Co., Ltd., founded in 2018 in the picturesque city of Yangzhou, China, is committed to delivering comprehensive, intelligent pipeline system solutions that cater to diverse needs.
Our extensive product range features HDPE, PVC, PP-R, MPP, and more, serving various sectors including construction, municipal engineering, agricultural drainage and irrigation, gas transportation, home decor, and power cable sheathing. With nearly 3000 different types and specifications of pipes, fittings, and valve products, we offer unparalleled versatility and reliability.
Our Advantages
We are dedicated to international trade, providing pipeline dealers worldwide with bespoke services. To ensure top-notch production, we have invested heavily in advanced mechanical equipment, leading to an impressive annual output of 30,000 tons, equivalent to filling 3,000 containers.
Our state-of-the-art machinery, coupled with a sophisticated management system, allows us to minimize costs, expedite delivery times, and guarantee the exceptional quality of each product.
Are you trading company or factory?
We are a professional manufacturer and warmly welcome you to visit our state-of-the-art factory at your convenience.
How long is your delivery time? For small quantity products, they will be delivered to you by international courier (DHL, FedEx, TNT etc.) or by air. Usually, it will take 3-5 days for you to receive the goods after dispatch. For large quantity products, they are delivered by sea. The transit time ranges from days to weeks, depending on the destination port.
Can you provide samples?
Yes, samples are available. For standard products, samples are free; you only need to cover the freight charges. For high-value products, you need to pay for freight and a portion of the product cost. After establishing a long-term partnership or becoming our VIP customer, we will provide free samples upon request.
Do you supply OEM service?
Yes, we offer comprehensive OEM services tailored to your specific requirements, including custom LOGO and packaging.
What are your terms of payment?
We accept TT or L/C at sight. For T/T, a 30% advance payment is required, with the balance due before shipment or through L/C.
What is your MOQ?
The Minimum Order Quantity (MOQ) is determined according to customer requests.
Is it possible to use my appointed label or package?
Yes, we are more than willing to use labels or packaging as per your specific requirements.
How can you guarantee the goods you offer are qualified?
We firmly believe that honesty and responsibility are the cornerstones of a reputable company. Therefore, all products we provide are guaranteed to be qualified. We conduct thorough testing and provide a Certificate of Analysis (COA) before delivery to ensure quality.
Address:
Yangzhou, Jiangsu, China
Business Type:
Manufacturer/Factory
Business Range:
Construction & Decoration, Industrial Equipment & Components, Tools & Hardware
Company Introduction:
Yangzhou Huawei Pipe Technology Co., Ltd., founded in the historic city of Yangzhou in 2018, is committed to delivering comprehensive, intelligent pipeline system solutions.
Our diverse product portfolio includes HDPE, PVC, PP-R, MPP, and numerous other series, extensively utilized in construction engineering, municipal projects, agricultural drainage and irrigation, gas transportation, home decoration, power cable sheathing, and more. We proudly offer nearly 3000 different varieties and specifications of pipes, fittings, and valve products.
Our company offers variety of products which can meet your multifarious demands. We adhere to the management principles of "quality first, customer first and credit-based" since the establishment of the company and always do our best to satisfy potential needs of our customers. Our company is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with anirresistible force.