Basic Info.
After-sales Service
Online After-Sales Service
Contraction Percentage
<0.4%
Ring Stiffness
Sn24, Sn32, Sn40
Flattening Test
When The Deformation in The Vertical Direction of
Colour
to Be Agreed Upon by Supply and Demand
Link Mode
It Is Connected by Hot Melt Butt
Transport Package
Customized According to Customer Requirements
Specification
According to the customer can be customized
Product Description
The MPP power pipe utilizes advanced modified polypropylene as its primary material. This innovative solution eliminates the need for disruptive dredging, digging, or road destruction, seamlessly facilitating the installation of pipelines, cables, and other infrastructural projects in challenging areas such as roads, railways, buildings, and riverbeds.
Compared to the conventional excavation method, trenchless pipe engineering aligns more closely with environmental protection mandates. Traditional construction typically generates dust, traffic congestion, and other nuisances. However, this cutting-edge technology enables pipeline installation without excavation in sensitive areas such as Heritage Conservation Districts, bustling city centers, protected farmlands, highways, rivers, and more.
Our MPP power pipe boasts a myriad of advantages, including exceptional strength, high-temperature resistance, straightforward installation, convenient construction, and cost-effectiveness.
MPP Cable Conduit Pipe's Parameter Datas |
Norminal Diameter/IN(mm) | Norminal Wall Thickness (mm) | Norminal Lenght (mm) |
Ring Stiffness (3%) Grade (Normal Temperature) |
SN24 | SN32 | SN40 |
100 | 8 | 8 | 10 | 6000/9000 |
125 | 8 | 10 | 12 |
150 | 10 | 12 | 14 |
175 | 12 | 14 | 16 |
200 | 14 | 16 | 18 |
225 | 16 | 18 | 20 |
250 | 18 | 20 | 20 |
Installation Instructions
In the installation process of MPP power cable protection tube, the connection method is a very important part. The correct selection of the appropriate connection method can ensure the reliable operation of the power piping system. This section introduces several common MPP power cable protection tube connection methods to help you understand the characteristics and application scenarios of each method.
01,Before installation, check whether the power supply, hydraulic oil, and heating plate of the welding machine meet the welding requirements; Conduct an empty car test run on the milling cutter oil pump switch, etc; Install the slips that match the specifications of the pipe into the rack; Set the temperature of the heating plate to the welding temperature, and before heating, wipe the surface of the heating plate with clean soft paper or alcohol to clean its oil stains.
02,Remove dirt from both ends of the pipe. Place the pipe into the frame clamp so that the length of the extension at both ends is equal. The parts outside the pipe rack should be supported by supports. Place the pipe at the same height as the centerline of the frame, and then secure the slip. Insert a milling cutter and mill the pipe.
03,After milling the pipe until continuous cutting occurs at both ends of the pipe, remove the pressure and let the milling cutter idle for two or three weeks before retracting the movable frame and turning off the milling cutter switch.
04,Take out the milling cutter and close the pipes at both ends. Check the end face, and the displacement of both ends of the pipe should not exceed 10% of the pipe wall thickness. When closing, there should be no obvious gap between the two end faces of the pipe, and the gap width should comply with: 0.3MM (DN<25MM); If 0.5MM (225MM400MM) does not meet the requirements, it should be milled again.
05,When the temperature of the heating plate reaches the set value, quickly place it into the rack and apply the specified pressure until the circumference of the pipe ends is flipped and the minimum curling reaches the specified height. Reduce the pressure to the specified value, so that the end face of the pipe is in contact with the heating plate, and continue heating until the specified time.
06,When the heat absorption time reaches the specified value, retract the movable frame and quickly remove the heating plate. Close the two pipe ends, and the switching time should be as short as possible, not exceeding the specified value. The closing pressure should not be too high, otherwise it will squeeze out the molten material and cause a decrease in welding quality.
07,Raise the pressure to the specified value and maintain pressure for cooling. After natural cooling to room temperature, release the pressure, loosen the slip, remove the pipe, and complete the welding.
Yangzhou Huawei Pipe Technology Co., Ltd., established in the picturesque city of Yangzhou, China in 2018, is your premier destination for one-stop intelligent pipeline system solutions.
Our diverse product portfolio includes HDPE, PVC, PP-R, MPP, and other series, extensively utilized in construction engineering, municipal works, agricultural drainage and irrigation, gas transportation, home decoration, and power cable sheathing. Boasting nearly 3000 varieties and specifications of pipes, fittings, and valve products, we stand at the forefront of innovation and versatility in our industry.
Our Advantages
Committed to excellence in international trade, we provide pipeline dealers across the globe with bespoke services tailored to their specific needs. Our investment in state-of-the-art mechanical equipment has enabled us to create a modern factory with an impressive annual output of 30,000 tons, capable of filling 3000 containers.
Thanks to our advanced machinery and sophisticated management systems, we effectively minimize costs, reduce delivery times, and ensure unparalleled quality in every product we manufacture.
Are you trading company or factory?
We are a professional manufacturer, warmly welcoming you to visit our factory at your convenience.
How long is your delivery time? For smaller quantities, products are delivered via international couriers such as DHL, FedEx, or TNT, typically taking 3-5 days after dispatch. Larger quantities are shipped by sea, with delivery times ranging from days to weeks, depending on the destination port.
Can you provide samples?
Yes, we provide samples. For standard products, samples are free, with freight costs borne by you. For high-value products, you must cover both the freight and a portion of the product cost. Once we've established a cooperative relationship or you become a VIP customer, free samples will be offered as needed.
Do you supply OEM service?
Yes, we provide OEM services tailored to your requests, including custom logos and packaging.
What is your terms of payment?
Our payment terms are TT or L/C at sight. Specifically, T/T 30% in advance, with the balance due before shipment, or by L/C.
What is your MOQ?
Our MOQ is flexible and can be adjusted to meet your requirements.
Is there any possible to use my appointed label or package?
Absolutely. We can use your designated label or packaging as per your requirements.
How can you guarantee the goods you offer are qualified?
We firmly believe that honesty and responsibility are the foundations of our company. Therefore, all products we provide are guaranteed to be qualified. We conduct thorough testing and provide a Certificate of Analysis (COA) before delivery.
Address:
Yangzhou, Jiangsu, China
Business Type:
Manufacturer/Factory
Business Range:
Construction & Decoration, Industrial Equipment & Components, Tools & Hardware
Company Introduction:
Yangzhou Huawei Pipe Technology Co., Ltd., founded in the historic city of Yangzhou in 2018, is committed to delivering comprehensive, intelligent pipeline system solutions.
Our diverse product portfolio includes HDPE, PVC, PP-R, MPP, and numerous other series, extensively utilized in construction engineering, municipal projects, agricultural drainage and irrigation, gas transportation, home decoration, power cable sheathing, and more. We proudly offer nearly 3000 different varieties and specifications of pipes, fittings, and valve products.
Our company offers variety of products which can meet your multifarious demands. We adhere to the management principles of "quality first, customer first and credit-based" since the establishment of the company and always do our best to satisfy potential needs of our customers. Our company is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with anirresistible force.