Basic Info.
After-sales Service
Online After-Sales Service
Contraction Percentage
<0.4%
Ring Stiffness
Sn24, Sn32, Sn40
Flattening Test
When The Deformation in The Vertical Direction of
Colour
to Be Agreed Upon by Supply and Demand
Link Mode
It Is Connected by Hot Melt Butt
Transport Package
Customized According to Customer Requirements
Specification
According to the customer can be customized
Product Description
The MPP power pipe, crafted from superior modified polypropylene, revolutionizes modern infrastructure. Designed for seamless integration without the need for dredging, digging, or road disruption, this solution excels in the installation of pipelines, cables, and other essential utilities across challenging locations such as roads, railways, buildings, and riverbeds.
Compared to the conventional 'digging method,' trenchless pipe engineering aligns perfectly with stringent environmental protection standards. Traditional methods generate dust, cause traffic congestion, and introduce numerous disturbances. In contrast, our cutting-edge technology facilitates pipeline installation even in sensitive areas like heritage conservation districts, bustling downtowns, crop farmlands, highways, and riverbanks where excavation is either impossible or highly impractical.
Our Electric Power Pipe boasts an array of superior attributes: exceptional strength, outstanding performance under high temperatures, straightforward installation, and convenient construction, all while maintaining a low-cost profile.
MPP Cable Conduit Pipe's Parameter Datas |
Norminal Diameter/IN(mm) | Norminal Wall Thickness (mm) | Norminal Lenght (mm) |
Ring Stiffness (3%) Grade (Normal Temperature) |
SN24 | SN32 | SN40 |
100 | 8 | 8 | 10 | 6000/9000 |
125 | 8 | 10 | 12 |
150 | 10 | 12 | 14 |
175 | 12 | 14 | 16 |
200 | 14 | 16 | 18 |
225 | 16 | 18 | 20 |
250 | 18 | 20 | 20 |
Installation Instructions
In the installation process of MPP power cable protection tube, the connection method is a very important part. The correct selection of the appropriate connection method can ensure the reliable operation of the power piping system. This section introduces several common MPP power cable protection tube connection methods to help you understand the characteristics and application scenarios of each method.
01,Before installation, check whether the power supply, hydraulic oil, and heating plate of the welding machine meet the welding requirements; Conduct an empty car test run on the milling cutter oil pump switch, etc; Install the slips that match the specifications of the pipe into the rack; Set the temperature of the heating plate to the welding temperature, and before heating, wipe the surface of the heating plate with clean soft paper or alcohol to clean its oil stains.
02,Remove dirt from both ends of the pipe. Place the pipe into the frame clamp so that the length of the extension at both ends is equal. The parts outside the pipe rack should be supported by supports. Place the pipe at the same height as the centerline of the frame, and then secure the slip. Insert a milling cutter and mill the pipe.
03,After milling the pipe until continuous cutting occurs at both ends of the pipe, remove the pressure and let the milling cutter idle for two or three weeks before retracting the movable frame and turning off the milling cutter switch.
04,Take out the milling cutter and close the pipes at both ends. Check the end face, and the displacement of both ends of the pipe should not exceed 10% of the pipe wall thickness. When closing, there should be no obvious gap between the two end faces of the pipe, and the gap width should comply with: 0.3MM (DN<25MM); If 0.5MM (225MM400MM) does not meet the requirements, it should be milled again.
05,When the temperature of the heating plate reaches the set value, quickly place it into the rack and apply the specified pressure until the circumference of the pipe ends is flipped and the minimum curling reaches the specified height. Reduce the pressure to the specified value, so that the end face of the pipe is in contact with the heating plate, and continue heating until the specified time.
06,When the heat absorption time reaches the specified value, retract the movable frame and quickly remove the heating plate. Close the two pipe ends, and the switching time should be as short as possible, not exceeding the specified value. The closing pressure should not be too high, otherwise it will squeeze out the molten material and cause a decrease in welding quality.
07,Raise the pressure to the specified value and maintain pressure for cooling. After natural cooling to room temperature, release the pressure, loosen the slip, remove the pipe, and complete the welding.
Founded in the picturesque city of Yangzhou, China, in 2018, Yangzhou Huawei Pipe Technology Co., Ltd. has been at the forefront of providing comprehensive and intelligent pipeline system solutions.
Our extensive product portfolio includes high-quality HDPE, PVC, PP-R, MPP, and other advanced series. These products are indispensable in various sectors such as construction engineering, municipal works, agricultural drainage and irrigation, gas transportation, home decor, and power cable sheathing. We proudly offer nearly 3000 distinct varieties and specifications of pipes, fittings, and valve products.
Our Advantages
Yangzhou Huawei Pipe Technology Co., Ltd. is committed to the international trade arena, catering to pipeline dealers worldwide with bespoke services. By investing in cutting-edge mechanical equipment, we operate a state-of-the-art factory with an impressive annual output of 30,000 tons, capable of filling 3000 containers.
Our top-tier machinery coupled with a flawless management system significantly reduces costs, accelerates delivery times, and ensures the exceptional quality of each product we produce.
Are you a trading company or a factory?
We are a professional manufacturer. You are warmly welcome to visit our factory at a time convenient for you.
How long is your delivery time? For small quantity products, delivery is by international courier (DHL, FedEx, TNT, etc.) or by air, typically taking 3-5 days after dispatch. For large quantity orders, shipping is by sea, with delivery times ranging from days to weeks depending on the destination port.
Can you provide samples?
Yes, samples are available. For standard products, samples are free with freight costs borne by you. For high-value products, you need to pay both the freight and a certain product cost. After multiple cooperations or once you become a VIP customer, free samples are provided as needed.
Do you supply OEM service?
Yes, we offer OEM services tailored to your requests, including LOGO, packaging, etc.
What are your terms of payment?
We accept TT or L/C at sight. Typically, T/T requires 30% in advance, with the balance due before shipment or by L/C.
What is your MOQ (Minimum Order Quantity)?
As per customers' requests.
Is there a possibility to use my appointed label or package?
Yes, we can use labels or packaging according to your requirements.
How can you guarantee the products you offer are qualified?
We firmly believe that honesty and responsibility are the foundation of a company. All the products we provide are qualified and tested, with a Certificate of Analysis (COA) supplied before delivery.
Address:
Yangzhou, Jiangsu, China
Business Type:
Manufacturer/Factory
Business Range:
Construction & Decoration, Industrial Equipment & Components, Tools & Hardware
Company Introduction:
Yangzhou Huawei Pipe Technology Co., Ltd., founded in the historic city of Yangzhou in 2018, is committed to delivering comprehensive, intelligent pipeline system solutions.
Our diverse product portfolio includes HDPE, PVC, PP-R, MPP, and numerous other series, extensively utilized in construction engineering, municipal projects, agricultural drainage and irrigation, gas transportation, home decoration, power cable sheathing, and more. We proudly offer nearly 3000 different varieties and specifications of pipes, fittings, and valve products.
Our company offers variety of products which can meet your multifarious demands. We adhere to the management principles of "quality first, customer first and credit-based" since the establishment of the company and always do our best to satisfy potential needs of our customers. Our company is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with anirresistible force.