Basic Info.
After-sales Service
Online After-Sales Service
Contraction Percentage
<0.4%
Ring Stiffness
Sn24, Sn32, Sn40
Flattening Test
When The Deformation in The Vertical Direction of
Colour
to Be Agreed Upon by Supply and Demand
Link Mode
It Is Connected by Hot Melt Butt
Transport Package
Customized According to Customer Requirements
Specification
According to the customer can be customized
Product Description
Our MPP power pipe, crafted with modified polypropylene as its primary material, revolutionizes the way we approach construction projects. Say goodbye to the need for dredging, excavation, or the destruction of road surfaces. Ideal for specialized sections such as roads, railways, buildings, and riverbeds, this innovative solution ensures seamless installation of pipelines, cables, and more.
Trenchless pipe engineering stands as an eco-friendly alternative to traditional excavation methods. Not only does it eliminate disturbances like dust and traffic congestion, but it also allows for pipeline installation in areas where digging is impractical or prohibited-such as heritage conservation districts, bustling urban centers, agricultural farmland, highways, and rivers.
Boasting numerous advantages, our MPP Cable Pipe Sn24-Sn40 offers exceptional high strength, outstanding high-temperature resistance, effortless installation, convenient construction, and cost-effectiveness, making it the superior choice for your infrastructure needs.
MPP Cable Conduit Pipe's Parameter Datas |
Norminal Diameter/IN(mm) | Norminal Wall Thickness (mm) | Norminal Lenght (mm) |
Ring Stiffness (3%) Grade (Normal Temperature) |
SN24 | SN32 | SN40 |
100 | 8 | 8 | 10 | 6000/9000 |
125 | 8 | 10 | 12 |
150 | 10 | 12 | 14 |
175 | 12 | 14 | 16 |
200 | 14 | 16 | 18 |
225 | 16 | 18 | 20 |
250 | 18 | 20 | 20 |
Installation Instructions
During the installation of the MPP power cable protection tube, selecting the right connection method is crucial for the system's reliability. This section elucidates various common connection techniques for MPP power cable protection tubes, offering insights into their unique characteristics and best application scenarios.
01, Prior to installation, ensure the power supply, hydraulic oil, and heating plate of the welding machine meet the necessary welding standards. Perform an empty run test on the milling cutter oil pump switch. Install the slips that match the pipe specifications into the rack. Set the heating plate to the required welding temperature, and clean its surface with clean soft paper or alcohol to remove oil stains before heating.
02, Remove any dirt from both pipe ends. Position the pipe into the frame clamp, ensuring equal extension lengths at both ends, supported adequately outside the pipe rack. Align the pipe with the frame's centerline, secure the slip, insert a milling cutter, and begin milling the pipe.
03, Mill the pipe ends until continuous cutting is achieved. Remove the pressure and idle the milling cutter for two to three rotations before retracting the movable frame and switching off the milling cutter.
04, Extract the milling cutter and bring the pipe ends together. Inspect the faces; the displacement at both ends should be within 10% of the pipe wall thickness. Ensure no obvious gaps between the end faces, adhering to the gap width requirement: 0.3MM (DN.<25MM); If 0.5MM (225MM400MM) does not meet the requirements, it should be milled again.
05, Once the heating plate reaches the set temperature, swiftly place it into the rack. Apply the specified pressure until the pipe ends' circumference flips and the minimum curling height is achieved. Reduce the pressure to the designated value, allowing the pipe end to contact the heating plate, and continue heating for the allotted time.
06,Upon reaching the specified heat absorption time, retract the movable frame, quickly remove the heating plate, and close the pipe ends. The switch time should be minimal, not exceeding the set value. Avoid excessive closing pressure to prevent squeezing out molten material, which would degrade welding quality.
07,Increase the pressure to the specified value and maintain it during the cooling process. Once naturally cooled to room temperature, release the pressure, loosen the slip, remove the pipe, and complete the welding process.
Yangzhou Huawei Pipe Technology Co., Ltd., established in the vibrant city of Yangzhou, China, in 2018, is committed to delivering comprehensive, cutting-edge intelligent pipeline system solutions.
Our distinguished product portfolio includes HDPE, PVC, PP-R, MPP, and an extensive range of other series, renowned for their exceptional utility in construction engineering, municipal projects, agricultural drainage and irrigation, gas transportation, home decoration, and power cable sheathing. Our catalogue boasts an impressive selection of nearly 3000 diverse varieties and specifications of pipes, fittings, and valve products.
Our Advantages
We are steadfast in our dedication to international trade, offering bespoke services to a global network of pipeline dealers. To support our vision of a state-of-the-art manufacturing facility, significant investments have been made in advanced mechanical equipment, achieving an impressive annual output of 30,000 tons, equating to the capacity of 3000 containers.
Harnessing superior machinery and an impeccable management system, we effectively minimize costs, accelerate delivery timelines, and guarantee the unparalleled quality of every product.
Are you a trading company or a factory?
We are a professional manufacturer, and we warmly welcome you to visit our factory at your convenience.
How long is your delivery time? For small quantity orders, products will be delivered via international couriers (DHL, FedEx, TNT, etc.) or by air, typically within 3-5 days after dispatch. For larger quantities, delivery is by sea, taking days to weeks to reach your destination port, depending on its location.
Can you provide samples?
Yes, samples are available. For standard products, samples are free, with only freight costs to be borne by you. For high-value products, you need to cover the freight and a portion of the product cost. Once we have established a cooperative relationship or if you become a VIP customer, free samples will be offered as needed.
Do you supply OEM services?
Yes, we offer customized OEM services based on your requirements, including logo design and packaging.
What are your terms of payment?
Our payment terms include TT or L/C at sight. Specifically, T/T 30% in advance, with the balance payable before shipment or via L/C.
What is your MOQ (Minimum Order Quantity)?
Our MOQ is determined based on customer requests.
Is it possible to use my specified label or packaging?
Yes, we can use labels or packaging according to your specifications if required.
How can you guarantee that the products you offer are qualified?
We firmly believe that honesty and responsibility are the foundation of a company. Therefore, all products we provide are qualified. We conduct thorough testing and provide a Certificate of Analysis (COA) before delivery to ensure their quality.
Address:
Yangzhou, Jiangsu, China
Business Type:
Manufacturer/Factory
Business Range:
Construction & Decoration, Industrial Equipment & Components, Tools & Hardware
Company Introduction:
Yangzhou Huawei Pipe Technology Co., Ltd., founded in the historic city of Yangzhou in 2018, is committed to delivering comprehensive, intelligent pipeline system solutions.
Our diverse product portfolio includes HDPE, PVC, PP-R, MPP, and numerous other series, extensively utilized in construction engineering, municipal projects, agricultural drainage and irrigation, gas transportation, home decoration, power cable sheathing, and more. We proudly offer nearly 3000 different varieties and specifications of pipes, fittings, and valve products.
Our company offers variety of products which can meet your multifarious demands. We adhere to the management principles of "quality first, customer first and credit-based" since the establishment of the company and always do our best to satisfy potential needs of our customers. Our company is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with anirresistible force.